Often Known as Cmk. This is a short term machine capability index derived from the observations from uninterrupted production run. Even though the formulae are as same as Cp&Cpk calculation,the standard deviation used here is sample standard deviation (RMS). The preferred Cmk value is >1.67.Usually, The long term process capability to be planned and studied after achieving the targeted Cmk Value
© Copyright iSixSigma 2000-2013. User Agreement. Any reproduction or other use of content without the express written consent of iSixSigma is prohibited. More »