|
|
 |
Six Sigma DMAIC...
Posted by: Seans Posted on: Saturday, 14th April 2001, 12:00 AM.
In Six Sigma Methodology ie DMAIC, I felt that Analyze Phase is the most critical. A correct data collection means everything ! But, how sure we are to say that the data collected for analysis really represent the actual process? What is the standard way of collecting appropriate data and sampling plan since every Black Belt Projects defer significantly in their nature? Message Thread:  Return To Discussion ForumPost A New MessageRead the Forum Guide to Good Etiquette
"The Bottom Line" Links
|
 |
|