|
|
 |
Lean Vs Six Sigma Project
Posted by: texgal Posted on: Friday, 27th January 2006, 11:04 AM.
I am a SS MBB but don't know Lean very well (but I did stay in a Holiday Inn Express). I am about to do a consulting assignment where I will need to determine what is a Lean project vs a Six Sigma project. I know the two can also be used together (Lean out the waste and then reduce variation), but I cannot find anything that tells me what situations would call for Lean alone, SS alone or Lean and SS together. Any light you can shed on this? Message Thread:  Return To Discussion ForumPost A New MessageRead the Forum Guide to Good Etiquette
"The Bottom Line" Links
|
 |
|