|
|
 |
Building a Data Collection Plan
 |
|
|
|
|
|
|
|
|
|
|
|
"A correct data collection means everything! But, how sure are we that the data collected for analysis represents the actual process?" Data Collection
|
|
|
|
By Patrick Waddick Step 5: After The Data Collection Process Referring back to the question of whether or not the data collection and measurement systems are reproducible, repeatable, accurate, and stable, the Black Belt or project lead should check to see that the results (data and measurements) are reasonable and that they meet the criteria. If the results are not meeting the criteria, then the Black Belt or project lead should determine where any breakdowns exist and what to do with any data and/or measurements that are suspect. Reviewing the operational definitions and methodology with the participants should help to clear up any misunderstandings or misinterpretations that may have caused the breakdowns. Next Page > Sample Populated Data Collection Plan Page 1 > Building A Sound Data Collection Plan Page 2 > Define Goals And Objectives Page 3 > Operational Definitions and Methodology Page 4 > Repeatability, Reproducibility, Accuracy and Stability Page 5 > The Data Collection Process
Copyright � 2000-2009 iSixSigma All Rights Reserved Reproduction Without Permission Is Strictly Prohibited Copyright Requests
Publish an Article: Do you have a Six Sigma tip, learning or case study? Share it with the largest community of Six Sigma professionals, and be recognized by your peers. It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.
"The Bottom Line" Links
|
 |
|