By Shree Phadnis Jump To Check Sheets: Check Sheet (1) for DrawingsCheck Sheet (2) for FeasibilityCheck Sheet (3) for Process MappingCheck Sheet (4) for Control PlanReferencesCheck Sheet (1) for Drawings
| Number | Particulars | Yes | No | Action Requred | Responsibility | Date | | 1. | Is tolerancing correct as per manufacturing capability? | | | | | | | 2. | Have all CTQs been identified on the drawing? | | | | | | | 3. | Is a bill of material complete and a part of the drawing? | | | | | | | 4. | Are reference dimensions identified to reduce inspection? | | | | | | | 5. | Are there any specifications specified that cannot be evaluated using known inspection techniques? | | | | | | | 6. | Are all material characteristics identified and specified on the drawing? | | | | | | | 7. | Are all dimensions that affect fit, function and durability identified and tolerance specified? | | | | | |
Check Sheet (2) for Feasibility
| Number | Particulars | Yes | No | Action Requred | Responsibility | Date | | 1. | Is selected process feasible for manufacture? a. Technically b. Cost wise | | | | | | | 2. | What inputs will the supplier need? | | | | | | | 3. | Are needed inputs provided? | | | | | | | 4. | What is supplier's feedback on achieving critical to quality for process? | | | | | | | 5. | Is there any process capability study done on the process? | | | | | | | 6. | What tolerance the supplier will be comfortably achieving? | | | | | | | 7. | Is supplier capable of measuring Critical to Quality? | | | | | | | 8. | Does supplier possess sufficient capacity to handle forecasted production? | | | | | |
Check Sheet (3) for Process Mapping
| Number | Particulars | Yes | No | Action Requred | Responsibility | Date | | 1. | Does flow chart illustrate sequence of production and inspection? | | | | | | | 2. | Does flow chart identify all the KPIV and the KPOV of the process? | | | | | | | 3. | Have provisions been made to identify and inspect reworked products before use? | | | | | | | 4. | Is costing derived from the flow chart? | | | | | | | 5. | Is there a separate flow chart for manufacture of tooling? | | | | | | | 6. | Are drawings available for tooling? | | | | | |
Check Sheet (4) for Control Plan
| Number | Particulars | Yes | No | Action Requred | Responsibility | Date | | 1. | Is control plan derived from flow chart, FMEA, DOE & critical to quality requirements? | | | | | | | 2. | Have all customer concerns been identified on control plan? | | | | | | | 3. | Are all critical Xs identified? | | | | | | | 4. | Is % contribution of X with respect to Y identified? | | | | | | | 5. | Is appropriate statistical control method identified for the critical Xs? | | | | | | | 6. | Are material specifications requiring inspection identified? | | | | | | | 7. | Does control plan address incoming through processing and assembly, including packing? | | | | | | | 8. | Are functional testing requirements identified? | | | | | |
References 1. Advanced Product Quality planning (QS 9000 Manual) 2. Robust Engineering by Taguchi
About The Author Shree Phadnis is a Master Black Belt at KPMG India. Mr. Phadnis is an ASQ certified Quality Manager and ASQ Certified Quality Engineer. Mr. Phadnis can be reached at shreephadnis@usa.net. First Page > Design for Six Sigma Process Overview Page 2 > Design for Six Sigma Process Overview