Six Sigma Quality Resources for Achieving Six Sigma Results
Innovation Training & Workshops from BMG Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Statistics  > Control Charts Search:
 
 for    
 Highlights: iSixSigma Merchandise |Buy BooksBuy Six Sigma eBooks|Six Sigma Blog | Quality Events and Training Calendar | Quality Dictionary | Six Sigma Quality Discussion Forum | Find Six Sigma Jobs Post Six Sigma Jobs | Six Sigma News and Press Releases | Free Six Sigma Newsletter | Calculate Your Process Sigma| Online Surveys
iSixSigma Magazine Signup
iSixSigma Live!
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
  Ldrshp. Conf. Arizona
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Statistics & Analysis
   Normality
   Variation
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Should You Use A Mean Or Individuals Control Chart?

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "What is the guideline if one of the data in the sample group falls out of either the UCL or LCL, but the average is within the UCL/LCL range? Is any action needed if these discrete data are still within the specification limit?"

    Control Chart Guideline
    By J
    New from iSixSigmaControl Charts Course

    Individuals and X-bar R Control Chart Template

    Root Cause Analysis Course
    ohn J. Flaig

    To plot individual data or to group the data and plot the mean on a control chart, that is the question. Several authors (not including Shakespeare) have weighed in on this issue and I want to present their arguments and then my own.

    First, let us assume that the process conditions are such that using a subgroup size of n = 1 is not a logical requirement. Under these conditions many SPC texts recommend that the data be subgrouped so that the central limit theorem applies to the subgroup means and hence the means will be approximately Normally distributed. These authors argue that the individuals control chart is very sensitive to non-normality and hence the Type I error may be significantly different than what is expected. They conclude that the individuals control chart should be avoided unless the data is approximately Normal or can be transformed into an approximately Normal distribution [Montgomery, 2001].

    On the other hand Dr. Wheeler says that control charts work irrespective of the distribution, so there is no reason not to use them for individuals data. I am going to take the liberty to suggest that when Dr. Wheeler says that they work he means that for all practical purposes differences in the false alarm rate (i.e., Type I error) do not significantly compromise the adequacy of the control procedure [Wheeler, 1995]. The logic supporting this argument goes back to Shewhart who based his conclusions on the Camp-Meidell theorem, which states if the distribution of X is unimodal (i.e., monotonically decreasing on each side of the mode) and the mode equals the mean, then the probability that X will deviate from its mean by more than k times its standard deviation is less than or equal to 1/(2.25k2)

    Now here is my perspective of the issue. In contrast to Dr. Montgomery's view I feel that the individuals control chart is to be preferred over the mean chart because the mean chart obscures the vision of the practitioner by preventing them from seeing what the process actually looks like. That is, using descriptive statistics (i.e., the mean) to characterize the behavior of the process rather than the actual data results in a loss of information, and game theory teaches us that the best decisions usually result from having the most information. I believe it is critically important for the analyst to have an accurate picture of the process, and the only way to do this is to look at the actual distribution of the individual observations.

    The practitioner should be concerned about the false alarm rate, if the cost of failure is high relative to the cost of inspection or if too many false signals seem to be undermining the confidence of the operators in the program. So, if you are concerned about the false alarm rate, you can always model the observed data distribution and use probability control limits to get more accurate results. Remember that a picture is worth a thousand words, and an accurate picture is worth ten thousand! - Don't throw away information!

    References
    Montgomery, D. C. (2001). Introduction to Statistical Quality Control. 4 Ed., John Wiley and Sons, New York, NY.

    Wheeler, D. J. (1995). Advanced Topics in Statistical Process Control. Statistical Process Controls, Inc., Knoxville, TN.

     
    Rate This Article:  Current Rating: 3.46
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma LLC – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links
    BMG
    CERTIFICATION
    Enhance Your Career With Lean Six Sigma Skills

    Green Belt or Black Belt - May 12 :: Atlanta, GA
    Green Belt to Black Belt Upgrade - July 7 :: Atlanta, GA
    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    M O T O R O L A
    U N I V E R S I T Y
    Learn from the most experienced
    practitioners of Six Sigma in the world

    Public Training & Certification
    Click here to take a free Six Sigma Lesson
    J

    URΛN

     
    Lean Six Sigma Public Workshop
    Upgrade to Black Belt- May 2008
    Become one of your organization's 'vital few'. Get Juran Certified.
     
    .
    ISSSP
    Follow the Leaders to Arizona!
    9th Annual Six Sigma Leadership Conference
    May 19th-22nd, 2008 • Scottsdale, AZ
    Click Here: More information & REGISTRATION
    .
    HOWARD UNIVERSITY

    4 weeks + 1 cost saving project + 1 mentor + 1 caring instructor = 1 Marketable Certified Lean Six Sigma Black Belt
    WINSTON SALEM
    STATE UNIVERSITY
    4 weeks + 1 cost saving project + 1 mentor + 1 caring instructor = 1 Marketable Certified Lean Six Sigma Black Belt
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .


    Download the iSixSigma Toolbar for 1-Click access. Search Your Way. Everyday. Without Delay.
    Get 1-Click iSixSigma access. Search Your Way. Everyday. Without Delay.

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. 2008 VERSION! Six Sigma DMAIC Training Slides
      The OSSS Six Sigma DMAIC course is comprised of:1,176 slides, Instructor notes, Slide explanations, 37 data sets, 20 sup...
    2. Organizational Culture Change Research Report
      Every company has a prevailing culture – the characteristic behaviors and norms that define what it is like to work in ...
    3. Certified Lean Six Sigma Black Belt Assessment Exam
      This test is useful for students interested in assessing their knowledge of Lean Six Sigma on the Black Belt level. It c...
    4. NEW VERSION! Process Management Training Slides
      The OSSS Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    5. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    6. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    7. The Next Big Thing: How Companies Innovate Research Report
      In today’s fast-paced and constantly changing business environment, staying ahead of the competition is no easy task. C...
     

    Six Sigma AdLinks
    Rath & Strong
    Quality Companion 2: Improve your quality project execution
    SBTI Public Offerings, World Class MBB, Lean Enterprise
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    SigmaWorks: A complete toolbox for LSS & DFSS
    @RISK for Six Sigma
    E6 Sigma - The Real Six Sigma
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma LLC, CTQ Media LLC. All rights reserved. v3.0lb, 1.2-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo