Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Methodologies  > DMAIC (Existing Product/Service) Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
   BPR
   DMAIC
   Kaizen
   Metrics
   Six Sigma
   TQM
   Work-Out
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Improving ED Wait Times at North Shore University Hospital

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Post a New Term Post A New Term
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "...To...reduce the waiting time, the physician has to hurry (yet)...the patient wants his treatment to be explained precisely by the physician only.... so this is the dilemma: How to reduce the waiting period without compromising on quality of service."

    Contribute to this Discussion

    B
    Download Products
    y Kevin G. Tuttle

    The Emergency Department (ED) increasingly is becoming the sole source of medical care for many individuals. It also is often called the "gateway" to the hospital since it is the first encounter many patients have with the hospital. Thus it is the place where positive or negative perceptions of the hospital initially may be formed.

    North Shore University Hospital in Forest Hills, N.Y., addressed this issue by initiating a Six Sigma project aimed at improving the patient experience in its Emergency Department. The project team took on the problem of excessive wait times in the ED while struggling at the same time with rising healthcare costs and increasing volumes of patients. The results have been impressive.

    North Shore University Hospital is a 302-bed community hospital located in Queens. It is one of 18 hospitals which are part of the North Shore-Long Island Jewish Health System, the third largest non-profit, secular health system in the country. North Shore University Hospital is unique in that there are three other competing hospitals within a three-mile radius. Its wait time project was begun in 2003 as part of a system-wide improvement initiative which started more than two years ago.

    Through data collection and analysis, the hospital's project team found that the average cycle time for treat and release, walk-in ED patients was more than three hours. As a result of the project, improvements were made to the Emergency Department process that not only decreased cycle times, but also raised patient satisfaction.

    The following are some of the findings, solutions and results as the team went through the DMAIC process:

    • Statistical analysis using Six Sigma methodology revealed that the average cycle time for an ED treat-and-release, walk-in patient was 187 minutes, with a standard deviation of 97 minutes.
    • At every stage of the process, patients' charts were "stamped" in a time clock so that the team could track patients from the time they walked in until a physician discharged them.
    • The data from the stamped charts was segmented into five categories:
      • Arrival to triage
      • Triage to registration
      • Arrival to seen by physician
      • Seen by physician to discharge
      • Arrival to discharge
    • Primary factors of delay in treating patients were the registrar on duty and the "batching" of charts by the registration staff. The physician on duty also seemed to be a major source of variation in the process.
    • The team utilized Six Sigma tools and process improvement steps to improve the patient flow process.

     Figure 1: Process Capability Analysis

     Figure 2: Press Ganey Measurements

    • Improvements resulted in a decrease in wait time by 37 percent, from 187 minutes to 118 minutes (Figure 1). The standard deviation decreased by 50 percent.
    • Patient satisfaction (as measured by Press Ganey Associates) also improved (Figure 2):
      • Overall Emergency Department scores increased by 1 point
      • Noticed-by-someone-at-arrival scores increased by 3.1 points
      • Time-to-treatment-area scores increased 4.2 points
      • Time-to-see-physician scores increased 5.4 points

     Figure 3: Patients Leaving Without Being Evaluated

    • The sigma score increased from 2.0 to 4.1. And the number of patients who left without being evaluated dropped by 50 percent. (Figure 3)

    Summary and a Lesson Learned

    The team was pleased with the results of the project. Patient satisfaction scores continued to increase and the environment in the Emergency Department changed. With time freed up by significantly decreasing wait times for treat-and-release patients, in-patient admissions also were handled more quickly. Those patients reached the appropriate units of the hospital faster.

    At the beginning of the project, all involved said that the Emergency Department was understaffed. There were not enough nurses, physicians, ancillary help and registrars. The team members also initially thought that staffing was a major issue. But after many conversations and long days crunching numbers, the team decided to trust the process and see what the data had to say. Much to the team's surprise, the data revealed the problem was not a staffing issue but a process issue.

    Once the appropriate changes were made to the process, staff members were not only seeing more patients, but enjoying their work more. Sick calls from the physicians and the nursing staff went down. When asked what changed in the department, many staff members said that the tension was removed. People enjoyed coming to work and patients had shorter, more pleasant stays while in the Emergency Department…all with the same number of positions in the department as when the project began.

    About the Author

    Kevin G. Tuttle joined the North Shore-Long Island Jewish Health System in 2000. He has worked in various capacities during his tenure, including director of patient access services and as a Six Sigma Black Belt. His areas of specialty include revenue cycle, patient financial services and hospital operations. Mr. Tuttle has a bachelors degree in management and a masters in health care administration from Hofstra University in Hempstead, N.Y. He can be reached at KeTuttle@nshs.edu.

     
    Rate This Article:  Current Rating: 4.03
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    1BMG
    UNIVERSITY
    .
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    M O T O R O L A
    U N I V E R S I T Y
    Learn from the most experienced
    practitioners of Six Sigma in the world

    Public Training & Certification
    Click here to take a free Six Sigma Lesson

    JURΛN

    2009 Lean Six Sigma Public Workshops - SPECIAL OFFER!
    Register for any course before December 31st and receive 50% off any additional registrations, plus receive free consulting support! Call 800-338-7726 to register.

    LodeStar Institute

    |

    Live Lean Six Sigma Training

    Starting at $660

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES.
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $200.00 • Click Here!
    Space is Limited! Hurry!
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
    4. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    5. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    6. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    7. CSSBB Preparation Pack
      The CSSBB Preparation Pack includes materials for passing the Certified Six Sigma Black Belt (CSSBB) exam. This CSSBB Pr...
     
    Six Sigma AdLinks
    Rath & Strong
    Learn statistics online with Quality Trainer by Minitab
    SBTI Public Offerings, World Class MBB, Lean Enterprise
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    SigmaWorks: A complete toolbox for LSS & DFSS
    Michigan Engineering - Six Sigma Certifications
    @RISK for Six Sigma and quality analysis
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 1.8-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo