Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Statistics  > Variation Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
   Normality
   Variation
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Mining for Lost Gold in the Transactional Environment

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "I am a Green Belt with a project to improve a transactional process. The team's goal is typical, reduce the amount of time it takes from process start to process finish.... Should I use averages or perhaps concentrate exclusively on cycle time?"

    Contribute to this Discussion

    B
    Download Products
    y John McGraw, iSixSigma Contributing Writer

    Searching for lost gold in the transactional environments that are major components of all organizations is a Six Sigma imperative. A number of ways are available for successfully mining transactional processes, thereby reaping significant savings.

    Transactional- or service-focused Black Belts and Green Belts address problems which center on the elimination of process chaos. Transactional chaos results in long wait times, missed deadlines and reactionary, expensive firefighting. Finding the culprit of lost time and money is the objective.

    Most metrics in a service organization are based on averages (average wait time, average audit days, mean claims processed). This view can lead to a false sense of security that the process is working properly when, in actuality, there is significant rework and variation causing chaos to those involved in the process. To the point: If a person has one hand in boiling water and one hand in a block of ice, on average, their hand temperature is comfortable. Extreme variation in process time can be more devastating than a consistently lengthy process.

    If time equals money, then time variation equals gold. Finding the root cause or causes that drive process variation is finding Six Sigma gold. For example, if order-to-delivery time which varies from between two and eight days can be improved to a consistent four days, every link in the supply chain can reduce their safety stock, advise their customers correctly of the arrival time, plan their staffing, reduce expensive expediting and focus more on core tasks.

    Cycle of Measurement and Analysis

    What is the best way to go about finding and mining lost gold? Within the DMAIC methodology, there is a repetitive cycle of measurement and analysis. This is a productive cycle, as it helps identify the areas that could be causing a problem and eliminates others that do not correlate with the failure. Using the following steps to mine for the culprit(s) has proven effective:

    1. Hypothesize
    2. Graph and Test
    3. Reject or Select
    4. Repeat or Complete

    Hypothesize - Usually it is easy to get people who are involved in the process to hypothesize why there is so much variation. To capture all these insights, a cause-and-effect diagram – affectionately referred to as a fishbone diagram – can be used to identify and categorize as many potential causes as possible. In subsequent reviews, consensus should be reached on the probable causes. If casual identification is difficult, the potential causes should be weighed for the following factors: potential (likelihood of it happening), impact (severity if it does happen) and frequency (how often it could happen). These numbers multiplied together will help prioritize what to check first.

    Graph and Test - These potential root causes (hypotheses) need to be investigated to determine if they are legitimate causes. The first step is to graph data collected around the potential cause and look for something to jump off the page. Since newly trained Green Belts and Black Belts are overwhelmed with a lot of new information and new tools, a quick reference guide like the one below helps in choosing the right tool.

    Theory

    Recommended Tool

    What to Look for

    Time-related cause (seasonality)

    Run Chart

    Trends (up, down, patterns, spikes)
    One or more categories or departments are causing the failure

    Pareto Chart

    80/20 Rule (one or two major drivers)
    One or more of the process steps are causing the failure

    Box Plot

    Tall boxes (indicates high variation)
    High boxes (indicates high mean)

    The interaction of two inputs is causing the failure

    Scatter Plot

    Grouping around a 45-degree angle

    Reject or Select - Using these graphical tools gives the first indication of whether a potential cause should be eliminated from consideration. In addition to these visual determinations, if a finding is questionable, there are mathematical tests such as a two-sample t-test that will determine if the identified cause is statistically different enough from other possibilities. With these tools, a project team will begin to reject some of its theories and select others to investigate further.

    Repeat or Complete - As necessary, a project team will repeat the process until the investigation is complete and the deeply buried cause is found.

    An Example of Successful Mining

    Below is a real-life example of this measure-analyze investigation loop. It is based on investigating the potential causes of large variation in processing time: 1) commodity difference, 2) seasonality, 3) department difference.

    Theory

    Tool

    Result

    Some commodities take longer (Figure 1)

    Pareto
    Chart

    No difference between commodities (fairly flat chart) – reject hypothesis
    Certain times of the year there are more claims to process, increasing time (Figure 2)

    Run
    Chart

    No indication that busy time of year is when processing takes long (flat run chart) – reject hypothesis
    Some departments have more variation than others (Figure 3)

    Box
    Plot

    Two of six departments had much larger variation (taller boxes) – initially accept, statistically test, dig deeper
    Difference between two methods of processing within the department (Figure 4)

    Box
    Plot

    One of two methods has a much higher mean (box higher on the left axis) – initially accept, statistically test, dig deeper
    When Method 1 (automated database) fails to import all open claims the first time, claims remain open until the next batch

    Two-Sample
    T-Test

    Statistically significant difference between claims imported and claims remaining for next batch – accept, found gold!

     Figure 1: Errors by Commodity – No Significant Differences

     Figure 2: Claim Process Time - No Obvious Seasonal Impact 

     Figure 3: Department Variation – B and C Vary Significantly (Investigate)

     Figure 4: Difference Between Two Methods of Processing 

    The automated claims process was reprogrammed to capture all open claims. This improved the average processing time and significantly reduced the variation of all claims processed across departments. This reduced phone inquiries, the need for expediting, manual overrides and a lot of frustration.

    Conclusion: Guidance, Practice and Tenacity

    Fluid use of the available Six Sigma tools does not have to be difficult. It just takes a good guide, practice and tenacity. Going after process time variability is like going after a huge gold mine that everyone else has been ignoring. The results will be eliminating fluctuations that were previously deemed "normal business," identifying opportunities to reduce rework, improving internal and external customer satisfaction, and preparing the organization to look at other areas of opportunity.

    About the Author

    John McGraw is a certified Six Sigma Black Belt. He has more than four years of Six Sigma project and deployment experience and more than eight years of data-driven continuous improvement experience. His Six Sigma specialties include business-aligned deployment, training effectiveness, dashboard development and transactional Design for Six Sigma. His business experience includes call centers, supply chain management, service strategy development and logistics. He can be reached at johnmcgrawmail@yahoo.com.

     
    Rate This Article:  Current Rating: 4.17
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    1BMG
    UNIVERSITY
    .
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    M O T O R O L A
    U N I V E R S I T Y
    Learn from the most experienced
    practitioners of Six Sigma in the world

    Public Training & Certification
    Click here to take a free Six Sigma Lesson

    JURΛN

    2009 Lean Six Sigma Public Workshops - SPECIAL OFFER!
    Register for any course before December 31st and receive 50% off any additional registrations, plus receive free consulting support! Call 800-338-7726 to register.

    LodeStar Institute

    |

    Live Lean Six Sigma Training

    Starting at $660

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES.
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $200.00 • Click Here!
    Space is Limited! Hurry!
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
    4. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    5. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    6. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    7. CSSBB Preparation Pack
      The CSSBB Preparation Pack includes materials for passing the Certified Six Sigma Black Belt (CSSBB) exam. This CSSBB Pr...
     
    Six Sigma AdLinks
    Rath & Strong
    Learn statistics online with Quality Trainer by Minitab
    SBTI Public Offerings, World Class MBB, Lean Enterprise
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    SigmaWorks: A complete toolbox for LSS & DFSS
    Michigan Engineering - Six Sigma Certifications
    @RISK for Six Sigma and quality analysis
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 2.0-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo