Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Tools & Templates  > Thinking Out Of The Box Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
   DOE
   FMEA
   Glossary
   Histogram
   Pareto
   Poka Yoke
   SIPOC
   Software
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Using the Theory of Constraints to Allocate Benefits

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "Has anyone tried to integrate theory of constraints (TOC) with Six Sigma (SS) or Lean Sigma?...Any thoughts on TOC/SS integration...would be much appreciated."

    Contribute to this Discussion

    B
    Download Products
    y Cristián Ulloa

    Many Six Sigma companies experience challenges in their effort to calculate and allocate benefits from throughput projects. This is a complex process, especially when the throughput capacity profile includes several different processes that behave independently, and where bottlenecks shift from one process to another. Employing the theory of constraints provides an effective solution.

    At BHP Billiton Base Metals, many ways of addressing this problem were tried until it was decided to apply the theory of constraints. The most difficult part of the application was convincing the operations area that it was the appropriate approach. It also was difficult to get process owners to understand that, although their project could significantly increase the capacity of a process, it might not have an impact on the bottom line because it does not address a bottleneck in the system as a whole.

    By using the theory of constraints, the company was able to develop a system where credit for project benefits is shared across all businesses that directly or indirectly contribute to increasing the total throughput of the system.

    Understanding the Bottleneck

    In any process there is always at least one constraint or bottleneck. As modifications are made to the process, the bottleneck often changes. It may be a piece of equipment, a process or any one of the following:

    • A policy
    • A procedure
    • The market (supply or demand)
    • A system
    • Operating procedures

    That clearly identifiable constraint in a process prevents the generation of maximum output. When the throughput capacity of a bottleneck increases, there are three possible outcomes:

    1. The bottleneck is reduced but remains after the improvement, creating additional throughput project opportunities.
    2. The new capacity of the bottleneck equals that of another part of the process. This may prevent the project from generating all theoretical benefits possible because there are now two bottlenecks adversely impacting each other.
    3. The original bottleneck capacity now exceeds the capacity of other parts of the process. These parts become new constraints preventing realization of the entire projected value associated with the original project.

     Figure 1

     Figure 2

     Figure 3

     Figure 4

     Figure 5

    Examples of Applying the Theory

    To ensure that a throughput project has predictable results, plot the capacity of the various stages of the process on the vertical axis of a diagram that has the process flow along the horizontal axis (Figure 1).

    This is the capacity profile. To ensure effectiveness, use consistent units of measure. For example, in the early part of a mining process, tons of ore (at any grade) is the capacity, whereas downstream during the beneficiation process, the impact of grade must be considered by fixing grade as a stated constant. In the mining business, the profile starts with development drilling and analysis all the way through to shipping a final product.

    If the capacity of Process A is increased to level A1 (Figure 2), the project is expected to return the anticipated benefits.

    Process A's capacity now equals that of Process B (Figure 3). If there is no significant buffer between the two (i.e., they are very close to being direct – coupled), there is a chance that achievement of all theoretical benefits associated with a change to level A2 (equal to B) is in jeopardy.

    The capacity of Process A now equals that of Process C (Figure 4). If the capacity of Process B does not increase, the maximum benefit will equal the capacity of Process B. In that situation, all theoretical benefits associated with a change to the level of Process A3 (equal to C) will not be achieved. In this case, all of the benefit is allocated to the team working on Process A. However, if the team working on Process B increases its capacity to a point between B and C, that benefit will be shared with Team A, which has increased its capacity to that of level C.

    If Process A's capacity were increased to A4 (Figure 5), this complete increase in benefits could only be achieved if B and C also were increased in capacity with other projects. If Process B's capacity were increased above C's capacity with another project, so that C becomes the constraint, then the value of the two projects is assessed as in the table below.

    ProjectIncreaseCredit for the Benefits

    A

    From A
    to B
    Team from Project A

    B

    From B
    to C
    Team A and B share value for this project, equally

    C

    From C
    to A4

    All three teams, A, B and C, share this increment










    As represented in the examples above, it is critical to the success of this methodology to know where the bottleneck is in the process and also the capacity of the different processes within the entire system. If the location of the bottleneck is not known, it is beneficial to identify it first before applying Six Sigma to improve the process.

    In most Six Sigma organizations, Six Sigma resources are limited. Allocation of these resources to projects that have an impact on reducing bottlenecks in the process is an effective way to reduce waste and rework within the process.

    Counting Benefits and Sharing Credit

    The benefit of all these projects together is found in the additional production that results. For bottom line impact, these revenue benefits are as important as cost savings. Using this approach, the company also ensures the elimination of duplicate counting of benefits when different project teams are working at the same time in different areas of the throughput line.

    Sharing credit for the benefits of projects that have directly or indirectly contributed to increasing the total throughput of the system generates a positive impact on the behavior of the teams involved. Teams understand that, even if their project may not have an immediate impact on improving the whole system, when the final bottleneck is addressed, their project will be acknowledged for its role in the higher throughput level. This also is beneficial in motivating project teams to use Six Sigma as an effective tool for improving processes.

    About the Author

    Cristián Ulloa is Six Sigma finance project manager for BHP Billiton Base Metals. He is a commercial engineer and has a degree in business administration, with extensive experience in finance, business development and process improvement. Mr. Ulloa has worked for several other multinational companies – Exxon Minerals, Placer Dome and Xerox. At BHP Billiton Base Metals, he implemented the financial network for Six Sigma across the company. He can be reached at Cristian.A.Ulloa@bhpbilliton.com.

     
    Rate This Article:  Current Rating: 3.77
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    1BMG
    UNIVERSITY
    .
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    M O T O R O L A
    U N I V E R S I T Y
    Learn from the most experienced
    practitioners of Six Sigma in the world

    Public Training & Certification
    Click here to take a free Six Sigma Lesson

    JURΛN

    2009 Lean Six Sigma Public Workshops - SPECIAL OFFER!
    Register for any course before December 31st and receive 50% off any additional registrations, plus receive free consulting support! Call 800-338-7726 to register.

    LodeStar Institute

    |

    Live Lean Six Sigma Training

    Starting at $660

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES.
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $200.00 • Click Here!
    Space is Limited! Hurry!
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    2. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    3. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    4. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    5. Certified Lean Six Sigma Black Belt E-book
      In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
    6. Applied Strategy Execution Training Guide + Slides
      Military battles are won when every foot soldier clearly understands what the 'Commander's Intent' means to him. ÂSE...
    7. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
     
    Six Sigma AdLinks
    Rath & Strong
    Learn statistics online with Quality Trainer by Minitab
    SBTI Public Offerings, World Class MBB, Lean Enterprise
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    SigmaWorks: A complete toolbox for LSS & DFSS
    Michigan Engineering - Six Sigma Certifications
    @RISK for Six Sigma and quality analysis
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 1.8-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo