B A common problem encountered in Lean, Six Sigma and TQM implementation is performance deterioration after the completion and handover of a breakthrough improvement. This can happen despite installation of control mechanisms to monitor ongoing performance. In this case study, a financial services company with a national sales network had already begun addressing concerns about its level of internal customer service. The company, which services the IT problems of internal users through a centralized help desk, had dramatically reduced help desk response times in Phase 1 of its improvement project. Response time had dropped 85 percent in the most frequently recurring call category. A control chart showed that 99.7 percent of these calls (average +3 sigma) were "closed" within the 30-minute service standard. But the issue of sustaining the changes suddenly was complicated by the simultaneous resignation or transfer of key team members. The improvement project therefore continued with two objectives:
Sustaining Improvement: The ProblemConverting individual project successes into sustained performance by operating personnel is critical to the development of any change initiative. This requires creating a quality mindset a far more challenging and time-consuming task than achieving the breakthrough improvement. What is a quality mindset? Using firefight as an example, the typical response to a fire is to fight it until it is extinguished. Then be ready to fight the next fire when it happens. Having a quality mindset also means responding to a fire by fighting it until it is extinguished. However, instead of waiting until the next fire, a quality mindset means finding the root cause of the first fire and working to prevent any other fires stemming from that cause. Companies with a quality mindset recognize "If you do not improve, you deteriorate" and demand sustained, continuous improvement efforts by operating teams. In institutionalizing this approach, everyone involved has a role to play:
Sustaining Improvement: The ProgramBefore the next phase (Phase 2) of the improvement project was launched, new team members were exposed to a two-day quality mindset program. Four key elements for sustaining the improvements were outlined:
This simple process ensures continuous improvement, however, to make it a "way of life" takes a lot of "grinding in." During Phase 2 every project meeting was therefore begun with a review of these activities. It took three months for the process to become routine and another three months before the benefits of the discipline began to be felt by the operating personnel. Phase 2 of the Improvement ProjectThe objective of Phase 2 was to achieve 99.7 percent response time within service standards for all calls. The project team used a seven-step process for problem-solving. Step 1. Selecting CTQ: This phase had the same CTQ as Phase 1, improved customer service. Step 2. Defining the Problem: Problem equals desired state minus current state. Selecting the metric: The metric chosen was D = actual standard response time. For 99.7 percent achievement of standard (average + 3 sigma) of D < 0. Analysis of one month of data revealed that (average + 3 sigma) of D was 439 minutes a surprisingly high figure. The problem: Reduce (average + 3 sigma) of D from 439 to < 0. Step 3. Finding Root Causes Why? Why? Why? Why? Why?: Standard maximum call response time categories were: 30, 60, 120, 240 and 480 minutes. Finding the vital causes: A Pareto chart revealed surprisingly high deviations in the 480-minute category. This category involved local power supply outages. Because this was an external condition and not controllable internally, these calls were placed in the 480-minute category. But generally the calls were resolved in less than 10 minutes. Eliminating such calls from the reckoning reduced the average +3 sigma of the deviation (D240) of the remaining calls (referred to as T240) dramatically. D240 = 82 minutes The calls remaining constituted 93 percent of all calls. The target was to reduce D240 by 50 percent. A two-pronged approach for finding root causes was used:
Method A is quick, easy and effective. It gears the team to resolve problems regularly and reinforces the quality mindset for sustaining improvement. The method consisted of brainstorming possible root causes and recording live data for reasons of delay when it occurs. This procedure resulted in a wide variety of causes being suggested. The most frequently mentioned included engineer busy, wrong classification, user wanted delay, customer served by call not closed, nobody available, call referred to vendor customer problem solved by not entered, approval delayed and hardware not available. "Decentralized" work to kill the delay in the three worst calls of the previous day was begun Method B prevents problems from occurring and yields dramatically better results in the longer term. From the above categorization, two problems were taken up for elimination. Problem 1
Using the dictum "What cannot be measured cannot be improved," questions posed were:
The ensuing discussion clearly showed that no standard operating procedure (SOP) existed. A draft process was developed for testing by some branches of the company with a request to identify the problem steps (y). The chart to the right was the result: Three points became evident:
A test with best practices yielded the following results:
Considered adequate at this stage, the process was tested at the two branch offices with the greatest problems.
Branch 1 was delighted with the result. Branch 2 had to face the next "why?" It was revealed that the communication link was slow. This was scheduled for upgrading. The project team was elated. A team member volunteered to replicate the results at all branches. The faith in data-based problem-solving and pride in their contribution strengthened the quality mindset.
Problem 2 Personal computer problems created eight percent of all calls. Data analysis revealed the causes in the table to the left. The first cause, loose connections, exposed the problem that the wiring was disorganized. The wiring of one of the most troublesome user stations was made neater, and for 10 weeks no complaints were received. Another group member was made responsible for replicating this housekeeping operation at all stations during the next three months. The quality mindset had become stronger. It was now proposed to develop a solution for each call category and hand over the implementation to different members of the project team. In the meantime, Method A was producing startling results. Steps 4 and 5. Check Results: D240 was improving substantially. The results achieved were: Pre-project D240 = 82 minutes How had the target of 50 percent reduction been achieved? The root cause was found to be that standards existed but were not used. The countermeasure was to begin regular reviews and thus create a sense of urgency. Step 6. Standardize Controls: A standard operating procedure was drawn up for daily plotting of the control chart and reviewing the three worst calls. The process was firmly established. Step 7. Quality Improvement Story: A quality improvement report was prepared and presented to senior management. Conclusion: Creating the Quality CultureEvery quality project needs to have both tangible and intangible gains. In this project the tangible gains were improved response time and faster customer service. The intangible gain was the quality mindset:
The tangible gains took six months in each phase of the project. The intangible gains took a year and could be lost even now if not reinforced by senior management continuously. Building the quality mindset depends on senior management. Despite the company's success in making improvements and sustaining them, it realizes there is room for further improvement. The company is moving ahead in a third phase of its improvement project. Phase 3 aims to cut the average +3 sigma delay level by 50 percent from 42 to 21 minutes for the tightened service standards. About the Authors: Niraj Goyal has 25 years of experience with multinational companies in various operating roles, among them operations director of Cadbury India Ltd., where he was among the leading implementers of the quality movement. He is the founder of Cynergy Creators Private Ltd. Mr. Goyal consults in India and the United States with manufacturing, IT, media and financial services industries. He specializes in training and facilitating the implementation of the techniques of Six Sigma/Lean/TQM. Mr. Goyal can be reached at nirajgoyal@vsnl.in. Kirti Patil is an engineer and has an MBA and 15 years of experience in managing IT infrastructure in manufacturing and financial services industries. She is a leading implementer of the quality movement in her organization and has successfully spearheaded a quality project in the technology services area. She is currently training to become a facilitator. She can be reached at kirtiapatil@yahoo.com. Reproduction Without Permission Is Strictly Prohibited Copyright Requests Publish an Article: Do you have a Six Sigma tip, learning or case study? Share it with the largest community of Six Sigma professionals, and be recognized by your peers. It's a great way to promote your expertise and/or build your resume. Read more about submitting an article. "The Bottom Line" Links
|
|
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
| Home | Discussion Forum | Event Calendar | Job Shop | |
| Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing | |
| Terms of Service. ©2000-2009 iSixSigma. All rights reserved. v3.0lb, 1.8-A-244 |
About iSixSigma · Contact Us · Privacy Policy · Site Map. |