Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Tools & Templates  > Thinking Out Of The Box Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
   DOE
   FMEA
   Glossary
   Histogram
   Pareto
   Poka Yoke
   SIPOC
   Software
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Value Stream Map Without All the Data Still Offers Gains

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "Does anyone have a good example of a transactional/service value stream map. My experience on this subject is manufacturing based and am exploring its uses in an 'office' environment."

    Contribute to this Discussion

    B
    Download Products
    y Craig Ladner

    A complete value stream map (VSM) is like a flowchart on steroids. There is the usual action boxes with arrows showing the flow of work, but a lot of other information, too – material and information flow, operating parameters, process and lead times, inventory, a timeline depicting value-added time relative to overall lead time, and so on.

    A value stream map can look daunting, especially for anyone who has not worked much with flowcharts and does not have all the needed data. But as one major national bank discovered, there is still a lot to be gained from starting a value stream map, even if there is not enough data to do the perfect map the first time through.

    The Challenge: Slash Cycle Time on Mailings

    The bank in question mails thousands of credit card offers each month. The process was on a 65-day cycle, meaning if the mailing was in early February, the process would have to be started in December. Bank management wanted to cut that time in half, and go even shorter if possible. Here is why:

    • The bank's credit card offers had a 1- to 2-percent acceptance rate.
    • The average balance transferred to the cards (in the targeted demographic segment) was about $1,000.
    • The lowest interest rate the bank charged was 12 percent (and some cards went as high as 21 percent).

    Given these factors, for every 100,000 offers mailed, the bank could expect to gain minimally $1,000,000 in credit card loans (1,000 acceptances multiplied by $1,000 transfers). That equals about $10,000 in interest per month. This nationwide bank often mailed out many hundreds of thousands of offers. Doubling the number of mailings in a year could well mean a million dollars or more in additional interest charges.

    Another minor factor was that addresses tend to get outdated quickly. So the faster the bank could process offers to the lists it purchased, the fewer bad addresses they would have to deal with.

    The Procedure: Determine Value and Time

    The bank had never studied, mapped or measured this process before, so doing a complete value stream map was out of the question. But just doing some preliminary analysis was well worth the effort.

    One of the most important elements of a value stream map is quantifying times. A fully developed VSM has time data for each step – how long it takes a work item to make it through one step, how long it waits in queue before moving to the next step, etc. Initially, the bank had no data at all on actual time needed to complete various steps in the process, and it determined that gathering detailed data would be impossible since there were no mechanisms for tracking time per step.

    But with a minimal effort, a consultant working on the project with them was able to divide the process into four phases and get reliable estimates for the length of those phases. The "prototype VSM" is shown in Figure 1.

     Figure 1: Basic Value Stream Map

    With this basic information in place, the bank could then examine the work that happens in each step and ask three key questions:

    • Does this work add value?
    • What determines how long this step takes?
    • Is there any way to do it faster? (Or, can some work currently done manually be automated? Or, can some work in this step be combined with work from another step?)

    What Was Discovered: Big Delays, Lots of Waste

    The bank's analysis of the VSM was that the pace of the process was determined in large part by an outdated mailing schedule that spelled out exactly what would be happening on each day of a two-month cycle. Unfortunately, it was built around artificial timelines, not actual process capability. So, for example, if a mailing list was ready to be merged on Day 20, but the schedule said that merging was to occur on Day 25, the list would sit around in the databank for five days.

    Cumulatively, delays caused by this artificially determined mailing schedule accounted for almost half of the two-month processing time. Simply moving to a system in which triggers alerted one step that work from a previous step was ready to go saved almost 30 days in the cycle time.

    The analysis also exposed a lot of work that was not value added from a customer's perspective. For example, the bank obtained mailing lists from a number of sources, which would arrive in a variety of electronic formats. The lists were formatted into a common software for processing. However, before the data processors moved the lists into the common software, they would convert each original list to a format they were most comfortable manipulating, then move it into the common software.

    A third main contributor to delays was the "large-batch" mentality built into the original system. The people who generated the offer letters through a mail merge process liked to work in monthly batches as large as 1.5 million letters. The system was capable of handling about 300,000 records per day. So if a particular list had only 50,000 or 100,000 names, they would wait until more lists came in and do the entire month at one time. Running 1.5 million records in one batch caused numerous delays downstream.

    The Result: Cycle Time Down by 60 Percent

    Four months after the project began, lead time for this mass mailing process was down from 65 days to 27 days. A year later, it reached 12 days.

    The lesson is that an organization should not let the complexity of some value stream maps prevent it from taking the first steps in doing a value and time analysis. As the bank learned, there was so much waste in its original process that broad measures of time and a little probing into what was truly value added allowed it to quickly cut lead time by more than 60 percent. If a company has never looked at how time is spent in a particular process or done a value-added analysis, the odds are very good that the same kind of benefits are out there waiting to be reaped.

    About the Author: Craig Ladner is a Lean expert and senior consultant with George Group. He has more than 20 years of experience generating productivity improvements through the application of Lean methods in a number of industries, and has worked extensively at senior levels to develop and deploy customer-focused operational strategies. Mr. Ladner has an MBA from Houston Baptist University. He can be reached at cladner@georgegroup.com.

     
    Rate This Article:  Current Rating: 4.20
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    1BMG
    UNIVERSITY
    .
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    M O T O R O L A
    U N I V E R S I T Y
    Learn from the most experienced
    practitioners of Six Sigma in the world

    Public Training & Certification
    Click here to take a free Six Sigma Lesson

    JURΛN

    2009 Lean Six Sigma Public Workshops - SPECIAL OFFER!
    Register for any course before December 31st and receive 50% off any additional registrations, plus receive free consulting support! Call 800-338-7726 to register.

    LodeStar Institute

    |

    Live Lean Six Sigma Training

    Starting at $660

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES.
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $200.00 • Click Here!
    Space is Limited! Hurry!
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
    4. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    5. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    6. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    7. CSSBB Preparation Pack
      The CSSBB Preparation Pack includes materials for passing the Certified Six Sigma Black Belt (CSSBB) exam. This CSSBB Pr...
     
    Six Sigma AdLinks
    Rath & Strong
    Learn statistics online with Quality Trainer by Minitab
    SBTI Public Offerings, World Class MBB, Lean Enterprise
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    SigmaWorks: A complete toolbox for LSS & DFSS
    Michigan Engineering - Six Sigma Certifications
    @RISK for Six Sigma and quality analysis
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 2.9-A-244
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo