Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Methodologies  > Kaizen Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
   BPR
   DMAIC
   Kaizen
   Metrics
   Six Sigma
   TQM
   Work-Out
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Roadblocks into Results: Lean Benefits Surgical Center

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "My organization is looking to determine which quality improvement method (Lean, Six Sigma, Lean Sigma, etc...) is more applicable in a hospital setting. Any advice?"

    Contribute to this Discussion

    B
    Download Products
    y Maryanne Kuchler and Michele Hoover

    Virtua Health System has applied Six Sigma, change acceleration process and Work-Out across its four-hospital system in New Jersey since 2000. Recently, as the institution was co-sponsoring and serving as a training ground for a Lean seminar, it was adding Lean to its process improvement toolkit.

    The seminar featured five Kaizen events. A Kaizen event is an intense, non-traditional meeting focusing on action and speed. It uses the concept of "try-storming" (an action-oriented version of brainstorming) where new ideas are tried in the process and then observed leading to improvements. While many other healthcare organizations benefited from the seminar, the Summit Surgical Center, a jointly owned partnership between Virtua Health and physicians, saw some direct improvements.

    About Summit Surgical Center

    The Summit Surgical Center is a for-profit, licensed freestanding ambulatory surgical center on the campus of Virtua West Jersey Hospital in Voorhees, New Jersey, USA.

    Outpatient surgery (also called same-day surgery) is performed in the modern facility, which has seven operating suites and two procedure rooms.

    Approved by the Accreditation Association for Ambulatory Healthcare, the Summit serves patients of all ages, from children to the elderly. It performed 9,899 procedures during 2005

    Three weeks before the Kaizen event which was to affect the surgical center, two experts from the Lean seminar co-sponsor visited Summit for four days of observation, data collection, spaghetti mapping and communications with members of the center's staff. Lean was explained as a way to make their jobs easier. Since the staff needed to be in training or involved in the Kaizen the whole week, arrangements were made to cover their regular duties.

    Learning About Lean

    First the staff learned that the goal of Lean is to create flow and eliminate waste (or muda as the Japanese creators of Lean would say) so that work serves the customer's needs and adds value to the process. Eight types of waste can be found in healthcare – defects, overproduction, transportation, waiting, inventory or resources, motion, over-processing and underutilization.

    The first step in Lean is to define value by obtaining the voice of the customer, the staff was told. Second, it is important to develop a value stream map (VSM) of the process, which illustrates and labels each step as value-added or non-value-added. The VSM shows how value flows to the customer and defines relationships among key process points. It documents the current state and provides groundwork for developing a future state – making waste clearly visible.

    The third step is to establish flow by "spaghetti" mapping product, services and information movements through the process or "value stream" (Figure 1). The ultimate goal of continuous flow is achieved by continuously adding value that leads to a reliable and flexible process.

     Figure 1: Spaghetti Map – All Travel for Supplies

    The fourth step is to implement "pull" or "just-in-time." The customer at the end of the process signals the need for a product or transaction. Only then does the process start and only the amount of time needed is taken. TAKT equals the total available working time divided by the total customer demand.

    The fifth phase is to work to perfection. The Lean project team strives to eliminate all waste so that every activity creates value bringing the process closer to perfection.

    Summit Surgical Center's Kaizen Event

    Based on the pre-event work, the surgical center Kaizen event had a dual focus – addressing issues in the sterile store room in the operating room and improving the purchase order and accounts payable process. The Lean opportunities for improvement in the surgical center were outlined as:

    • Improved visual management of the supply process.
    • Streamlined workflow for the supply ordering, distribution and payable processes.
    • Enhanced point of use storage and synchronized consumption based replenishment systems for supplies.
    • Standardized process for ordering supplies.

    The Kaizen event began on a Monday afternoon with a process walk through and worksite observations. The group then compared notes and brainstormed ideas for improvement. By the end of the day the group split into two teams – one to apply more traditional physical Kaizen methodology to eliminate the congestion in the central sterile supply room and the second team to apply transactional methodology to improve the purchase order through accounts payable processes.

    Translating Ideas into Action

    During the second day the teams began translating the ideas into action. The central sterile team focused on finding a way to change the rolling racks to stationary shelves. In order to lock the rolling racks in fixed position with enough aisle space between them for walkways, at least one rack would need to be removed from the room. This led to the first action step in the central sterile room to assure that the staff was only storing what was needed for case cart preparation. 

    One major accomplishment was removing the pain management supplies from the room and creating two standardized pain management carts. Meanwhile, the transactional team used the SIPOC model (supplier, input, process, output and customer) to define the flow of the purchase order through accounts payable process. The flow was illustrated on a wall, with a self-stick note labeling each step. Transactional processes involved 23 inputs with 13 input methods during 25 process steps that took 10 days to accomplish the 98 minutes of actual work. Day 2 concluded with a report of the accomplishments, challenges and next steps to all staff and the project sponsors.

    The third day was filled with significant challenges. The central sterile team had already removed one set of racks when they made two major findings – there was not a sub-floor beneath the racks and, more importantly, removing the set of racks they had focused on would not create enough space to have clear walkways in between the aisles when the racks were locked in fixed positions.

    Time was another pressure-inducing element. The surgery center was in disarray with pieces of racking and inventory spread through the hallway, and before closing in one hour, this would have to be restored to working order for the morning start-up.

    The team considered scrapping the idea of stationary shelves, but then looked at alternatives, including expanding the central sterile area into an adjacent area. That could not be accomplished in the Kaizen event since the space was already in use and would need walls removed and locking doors installed to meet the requirements for a sterile area.

    Turning Roadblocks into Results

    With renewed energy from a late-night pizza delivery, the team recommitted to the original plan of stationary shelving. Tape measures, simulated self-stick note layouts and white board sketches led the team to determine that a different, and larger rack would have to be removed to provide sufficient clearance between the fixed shelves. The original rack was re-installed and the team revisited the 5Ss (sort, set in order, shine, standardize and sustain) sorting through what was really needed in the room.

    The team questioned the need for specialty supplies, such as eye surgery supplies, to be located in the central sterile room since all eye/lenses surgeries were performed in a dedicated operating room (OR). This not only created space, it also broke through the thinking that there always has to be a case cart for a surgery.

    Eye supplies were moved to the point of use, OR 3. In addition to removing the need for a nurse to prepare a case cart, this eliminated duplicate touches for the same supplies, preserving sterile integrity and enhancing visual management, while improving presentation and ease of use for surgery staff. With this breakthrough, the team was unstoppable, and before the night was over it had overhauled the central sterile storage room, the suture supply area, OR 3 and emergency supplies, among others.

    The transactional team succeeded in standardizing the method and locations for requesting supplies, but realized the larger impact would require more physical changes. First, however, they members had to overcome resistance to the idea of moving processes to new locations. The team assembled a business case and received permission to tryout the changes – which involved co-locating staff from a separate building five miles away.

    Kaizen Challenges Resolved by Creativity

    These challenges forced the teams to find creative solutions to what would seem impossible situations. When the situation seems insurmountable, the team invariably finds a way to make it work.

    Day 4 focused on completing implementation of the improvements and documenting their effectiveness. The teams developed standard operating procedures, adjusted item locations, and added finishing touches such as labels and signage. With solutions in place, measures were repeated to quantify and compare the impact of the improvements.

    New spaghetti maps were drawn, distances were tracked using the new process, cycle times were re-measured and inventory quantities changes were tracked. The teams were impressed with the improvement they had implemented and how changes to daily processes made their jobs easier. The table below documents the impacts they had.

     Kaizen Impact Summary

    Before

    After

    Impact

    Order Processing
      11 Handoffs
      13 Input Methods
    Lean Activities
      > Process Map
      > Visual Mgtmt.
      > 5S
      > Flow
    > Reduced time on non-value-added from 62 minutes to 38 per order
    > Reduced number of physical handoffs to six
    > Reduced input methods to eight
    > Clear process
    Central Serile Room

      Major Safety Issues
      Congestion
      Delays
      Interruptions

    Lean Activities
      > 5S
      > Point of Use
      > Flow
    > Reduced time on non-value-added from 18 minutes to 0 per case
    > No delays or interruptions
    > Reduced time from 20 minutes to 2 per CSS cart
    AP Cycle Time
      25 Process Steps
      10 Day Lead Time
      98 Minutes Work
    Lean Activities
      > Flow
    > Reduced process steps to 17
    > Reduced lead time to four days
    > Reduced work to 62 minutes

    The final day was reserved for report outs and a well-deserved celebration. As exhausting as the experience was, participants reported their accomplishments with pride and were ready to participate in additional events. The Summit Surgical Center staff also responded positively to the changes. Now multiple departments are vying for the next Kaizen. With this week-long event, the Lean journey had begun.

    About the Authors: Maryanne Kuchler is the clinical support manager at Summit Surgical Center, a part of the Virtua Health System. She is a registered nurse with 27 years of operating room experience, the last 19 years in ambulatory surgery. Her current role includes varied responsibilities within the surgical center and the health system. She can be reached at mkuchler@virtua.org. Michele Hoover is a Lean consulting manager at GE Healthcare's Performance Solutions. She has 15 years of experience leading the implementation of Lean in a variety of industries, including healthcare. Ms. Hoover is currently based in Rochester, Minnesota and can be contacted by email at michele.hoover@ge.com.

     
    Rate This Article:  Current Rating: 4.00
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2009 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    BMG
    UNIVERSITY
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    >> Get Certified Now

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    JURAN

    Budget constraints halting your improvement efforts?
    They don't have to! Learn about our accelerated cost reduction methods.

    LodeStar Institute

    |

    Public & Onsite Lean Six Sigma

    Also New Live WEB Training

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $500 • Click Here!
    Register by October 14
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    4. Six Sigma Black Belt (DMAIC) Training Slides - 2009 Version!
      The 2009 Six Sigma Black Belt course includes over 40 more slides than the 2008 version. Contents include: 1,220 PowerPo...
    5. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    6. Certified Lean Six Sigma Black Belt E-book
      In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
    7. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
     
    Six Sigma AdLinks
    Learn statistics online with Quality Trainer by Minitab
    Rath & Strong
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2009 iSixSigma. All rights reserved. v3.0lb, 2.0-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map