Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Methodologies  > Lean, Lean Six Sigma and Lean Manufacturing Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
   BPR
   DMAIC
   Kaizen
   Metrics
   Six Sigma
   TQM
   Work-Out
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Lean's Visual Improvements Impact Clinical Operations

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • B
    Download Products
    y Volker Probst, Catherine Hughes and Deborah Christopher

    Among great strides in quality and efficiency achieved by Virtua Health in New Jersey, USA, in recent years are the results achieved by process improvement teams at the healthcare system's 95-bed Virtua West Jersey Hospital Berlin in the emergency department, operating room and central sterile supply.

    The Virtua Hospital Berlin initiative focused on visual improvements of clinical operations in the specified areas, reduction of inventory costs, enhancement of employee satisfaction and safety, and most importantly better serving patient needs. Specifically, the teams at Berlin were charged with eliminating patient and employee safety related issues in the operating room (OR) and creating a systematic collaboration between the central sterile supply (CSS) and the OR as it related to equipment processing. In the emergency department (ED), the challenge was to improve the reception area and triage as seen through the eyes of patients.

    The first step was to understand current processes through time observation studies, stakeholder interviews, spaghetti charts and value stream maps (Figure 1), then to identify waste in the process. Waste elimination was highlighted in the value stream map in the form of wait time for ED patients and travel time for the nursing staff in the OR.

     Figure 1: Value Stream Map for the Emergency Department

    Visual Management Tools and Observation

    To improve satisfaction and efficiency in the emergency department, the ED team decided to start the continuous improvement journey at the first step – the reception area and triage. This was the patients' first interaction with the hospital. Cluttered areas made it difficult for patients to identify the process they needed to navigate for treatment. This created a negative impression that was reflected in patient satisfaction surveys. It was decided that visual management tools, such as 5S, were to be implemented to simplify the process for both patients and clinical staff.

    In the OR, nurses were forced to take many trips into the supply storage area to obtain supplies and equipment during surgeries, interrupting the flow of that process. Licensed clinicians were "picking" cases, during the day, as their schedule allowed. The observations further revealed employee safety issues (trip hazards, blind spots, movable rolling racks, etc.) in the storage room. The observation tool "golf score" was used to assign points to the physical motions nurses used while preparing case carts. This tool helped to identify excessive motion of the staff in the preparation process. It indicated staff reaching where they could not see, bending and lifting. The team's actions improved the case cart golf score from 417 to 91.

    The team also noticed a large amount of clutter and excessive inventory in both the CSS and the OR. The goal for the CSS and the OR was to reduce the inventory and create a replenishment method to keep the inventory in control. That team also initiated a pilot project utilizing "just in time" (JIT) concepts to start the case carts in the CSS. The incorporation of JIT concepts allowed staff from the CSS to pick carts in the CSS and deliver to the OR only when the supplies and equipment were actually needed.

    With approval from the hospital's executive sponsors, the visual improvement goals were set and aligned with the Virtua Star of excellence (Figure 2).

     Figure 2: Alignment of Kaizen Goals with System-wide Strategic Imperatives

    The Kaizen Event and Trystorming

    The two teams were split into sub-teams, one for each identified area. The sub-teams observed the process firsthand and reviewed pre-work completed by Kaizen leaders during the previous few weeks. Upon their return into the meeting rooms, the teams then used Work-Out tools to brainstorm solutions and put together an implementation, or "trystorm," plan for the next day.

    Day 2 and 3 of the Kaizen event were devoted to making the actual changes. Of course, during this period the OR/CSS and the ED were still receiving and treating patients. The ED team identified ideas it wanted to trystorm in the actual area, including simplifying the patient sign-in process, removing unnecessary clutter, and actually trystorming a new streamlined triage process for the patients. One result was an overall reduction of the registration/triage time range of 70 percent. The team also decided that in order to visually improve the area a new coat of paint would be beneficial. That idea was immediately embraced by the medical director, who donated his own time to the cleaning and painting.

    After reviewing current case mixes and use of supplies, the CSS/OR team moved mountains of inventory, removed massive amounts of clutter, and disposed of outdated and unused supplies. This was a labor- and time-intensive undertaking, but by the last day the team was able to put the pieces together again in order to see these improvements visually. The OR/CSS not only became a cleaner and more organized environment, but the team also was able to donate and redistribute many medical supplies to other ORs in the healthcare system. Outdated equipment and supplies were disposed of and safety hazards that had been identified in the areas were removed. The reclaimed space was then marked to clearly identify tasks that were to be performed and to avoid future possibility of clutter.

    While the majority of the team focused on reclaiming control over the actual storage area, the CSS sub-team removed trip hazards and reorganized the actual CSS storage area. It also created a first step to a JIT system that would start the cases in the CSS and would free up space by only delivering the supplies and equipment needed for surgeries the next day. This also increased the teamwork between the two physically separated teams and removed non-essential tasks, creating greater value for the clinical team.

    Sustaining Changes with 30-Day Action Plan

    As some of the ideas and tasks could not be accomplished in the actual Kaizen week, a 30-day follow-up action plan helped to assure items were completed and changes could be sustained. Beyond the physical changes, the teams also implemented an improved replenishment system in the OR to further reduce on-hand inventory, spread visual controls to other areas in the OR, and adjusted the patient sign-in and triage process in the ED. Everyone caught the true Kaizen spirit of continuous improvement, striving for better patient care every day.

    Leadership involvement is critical to the success of such initiatives, and the team received support from local leadership throughout and after the event. Executives engaged in the process included the hospital's chief operating officer, the vice president for patient care, the assistant vice president of operations and the quality director. This alongside with the participants from the area, the facilities team, and the fresh eyes from outside the area were important factors to creating this visual success story.

    As Pat Williams, nurse director of the hospital's emergency department, said, "This has been an incredible experience to see the process through the eyes of the patient. And the great thing is, it still continues to spread."

    About the Authors: Volker Probst is a senior consultant for Performance Solutions at GE Healthcare. He has more than eight years of project management and process improvement experience at GE and two years of Lean deployment and transformation experience in healthcare. He can be reached at volker.probst@ge.com. Catherine Hughes, RN, is vice president for patient care, Virtua Berlin and Camden divisions and post acute services. She has an extensive background in healthcare and nursing management. She has been with Virtua Health for five years and has been involved in numerous Six Sigma projects, acting as executive sponsor, sponsor and process owner. During recent Lean events, she was the sponsor for all three clinical areas. She can be reached at chughes@virtua.org. Deborah Christopher, RN, has been with Virtua Health for four years and with operations improvement as a Six Sigma Black Belt for four months. She is actively involved in the Six Sigma process and is scheduled to lead three Lean Kaizens for Virtua Health in the next several months. She can be reached at dchristopher@virtua.org.

     
    Rate This Article:  Current Rating: 3.83
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    1BMG
    UNIVERSITY
    .
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    M O T O R O L A
    U N I V E R S I T Y
    Learn from the most experienced
    practitioners of Six Sigma in the world

    Public Training & Certification
    Click here to take a free Six Sigma Lesson

    JURΛN

    2009 Lean Six Sigma Public Workshops - SPECIAL OFFER!
    Register for any course before December 31st and receive 50% off any additional registrations, plus receive free consulting support! Call 800-338-7726 to register.

    LodeStar Institute

    |

    Live Lean Six Sigma Training

    Starting at $660

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES.
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $200.00 • Click Here!
    Space is Limited! Hurry!
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
    4. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    5. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    6. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    7. CSSBB Preparation Pack
      The CSSBB Preparation Pack includes materials for passing the Certified Six Sigma Black Belt (CSSBB) exam. This CSSBB Pr...
     
    Six Sigma AdLinks
    Rath & Strong
    Learn statistics online with Quality Trainer by Minitab
    SBTI Public Offerings, World Class MBB, Lean Enterprise
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    SigmaWorks: A complete toolbox for LSS & DFSS
    Michigan Engineering - Six Sigma Certifications
    @RISK for Six Sigma and quality analysis
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 1.8-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo