Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Statistics  > Data / Sampling / Descriptive Statistics Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
   Normality
   Variation
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Renew the Commitment to Data-Based Decision Making

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "...I'm looking for an example of when a decision on process improvement was made on a 'hunch' and tuned out to be a bad decision. For some reason these are proving to be elusive in my literature review...."

    Contribute to this Discussion

    B
    Download Products
    y David Wetzel and Kim Buch

    A large corporation recently conducted a competition to identify the organization's best Six Sigma projects of the previous year. Out of more than a hundred submissions, only one actually validated its improvements with a comparative experiment (z, t, Chi-sq, etc.). What did the rest do? The same thing they did before Six Sigma. The mean went in the right direction so the company was happy (mostly because it saved a lot of money). While this approach may be increasingly common, it is not how Six Sigma is supposed to work.

    Originally, Six Sigma projects were about validating process improvements and savings with sound statistical methods. This approach was at the heart of what made Six Sigma different and powerful. Organizations desiring a truly successful continuous improvement program need to renew the original emphasis on data-based decision making within the Six Sigma methodology.

    Diagnosing Current Approach to Decision Making

    One of the most important contributions of Six Sigma initiatives is the use of validated data to make statistically based decisions to both promote and validate change. The term "validated" refers here to the use of known good data; collected and analyzed to support and confirm decisions made by a project team. The extent to which organizations actually utilize data-based decision making within Six Sigma initiatives varies, and can be determined by answering the following questions:

    1. Measurement Validation (Measure Phase of DMAIC)
        a. Do we know how to validate attribute data for counts and dispositions?  
        b. Do we know how to validate continuous data?  
        c. Do we know when time studies and paired t-tests are applied to validate data?

    2. Comparative Experiments (Analysis Phase of DMAIC)
        a. Do we use comparative experiments to stratify data and obtain clues to potential root causes?
        b. Do we use relational statistics to quantify and model the impact of root causes on the "main pain"?

    3. Research Methods (Improve Phase of DMAIC)
        a. Do we understand how to leverage research methods?  
        b. Do we know how to leverage sample size, randomization, and control groups?

    4. Statistical Validation (Improve and Control Phases of DMAIC)
        a. Do we use comparative experiments to validate improvements in both central tendency and variability?  
        b. Do we use comparative experiments to validate improvements in savings and process capability?

    5. Sustainability (Control Phase of DMAIC)
        a. Do we use statistics to prove short-term sustainability?
        b. Do we use statistics to prove long-term sustainability?

    Too many Six Sigma teams respond "no" to most of these questions. If an organization finds that true in the ranks of its practitioners, perhaps its Six Sigma initiative could benefit from an increased understanding of, and reliance on, data-based decision making. But first, one must consider the alternatives to data-based approaches to decision making, and why they are not an adequate basis for quality improvements.

    Other Decision-Making Methods

    Many decision-making typologies have been proposed, but most include the following basic categories: traditional, authoritative, intuitive and scientific.

    Traditional decision making is doing things based on the way things have always been done. Tradition is codified in procedures, standards, regulations and doctrine. Someone at one time or another found a "one best way" to conduct business, solve issues or resolve problems. Tradition becomes unconscious; it is easier to follow established rules than question them. This is a natural coping mechanism for lowering stress and making efficient use of organizational resources. Sometimes traditional processes and codified knowledge are necessary and purposeful; however, many are not. These are the types of situations which Six Sigma initiatives should be used to challenge, rethink, redesign and improve.

    According to organizational theory, as noted by J.R.P. French and B. Raven in The Bases of Social Power in the book Studies in Social Power, power in organizations is derived from three sources – authority, charisma and knowledge. Organizational decisions are often made based on charisma, the individual's magnetism, persuasiveness and debating abilities. Expert knowledge decisions hale from two sources, both knowledge experts and on-the-job experts. These are the folks who know how to get work done within the existing organizational culture and structure. They include firefighters, expeditors and others who have established the networks and skills to get issues resolved and problems solved. Expert knowledge also may enhance the decision-making role of Six Sigma practitioners, change agents and statisticians.

    Unlike power derived from charisma or knowledge, authoritative decision making relies on the inherent power of those in authority positions. Authoritative decisions come from management and are necessary for a modern bureaucracy to function properly. However, an over-reliance on authority-based decision making prompted the need for more participative management approaches that empower employees at all levels of the organization, according to business professor and author Edward E. Lawler. Six Sigma is one such power-sharing, participative approach to management, and as such, is not always compatible with authoritative-based decision making. Thus, while Six Sigma teams may utilize the expertise of organizational members and the perspectives of those in authority, they cannot rely on these sources as the sole basis for sound decision making.

    Intuitive decision making includes many non-structured strategies for reaching decisions, Edward Lumsdaine and Monika Lumsdaine wrote in their book Creative Problem Solving: Thinking Skills for a Changing World. These include hunches, the "ah-ha" phenomenon, trial-and-error, guessing and experience. Everyone knows about these approaches because it is "human nature" to over-rely on them, even though scientific evidence has shown them to be both inefficient and ineffective. People are pattern creatures who make quick intuitive decisions based on previous experiences using both deductive and inductive reasoning. However, something other than intuition alone is required for process improvement projects. Intuition and experience about potential root causes and solutions are acceptable only as long as decision makers are willing to balance their preconceived notions and other possibilities with data.

    Scientific decision making includes the analytical/engineering approach, the scientific method and the quality approach, according to Lumsdaine and Lumsdaine. The analytical/engineering approach models problems mathematically, while the scientific method tests inductively derived hypotheses with empirical data. The quality approach to decision making combines elements of the analytical and scientific methods into a data-based approach centered on the DMAIC methodology.

    Originally, early practitioners of Six Sigma (circa mid-1980s) were schooled in statistics, research methods, and the validation of data and improvements. For many different reasons – e.g., economy of scale, lack of skilled practitioners, poor metrics, and the inevitable weakening of training and certification – the original statistical rigor has been eroded. To correct this movement away from data-based decision making, a number of suggestions should be considered.

    Data-Based Decision Making

    Usually a missing component to Six Sigma training is a clear illustration of the logical flow of data-based decision making. The flow chart shown in Figure 1 can be to illustrate the sequence of events necessary for data-based decision making.

     Figure 1: Data-Based Decision Making Flow

    The flow can be thought of in a simplified way as data --> information --> graphical displays --> decision making. Essentially, data-based decision making is using better pictures of data to make better decisions. It is what is added to graphical displays of data and data trends that separate them from other decision-making methods. It is specifically the fitting of distributions, establishment of probabilities and the addition of decision limits that enable better decision making.

    The flow starts when validated data (baseline or historical) is collected. Since most people do not get much from spreadsheets of numbers, data summaries are created, i.e., measures of central tendency, variability, skewness, peakedness, percentiles and outliers). And since people usually do not like summaries of numbers any better then raw data, pictures of data are created to illustrate central tendency, i.e., "a picture is worth a thousand words" (or numbers in this case). From these graphical displays, one can overlay or fit known distributions. From these distributions, one can calculate probabilities. From the probabilities, one can create decision limits that allow better decisions.

    Integrating Data-Based Decision Making into DMAIC

    Data-based decision making is at the heart of Six Sigma and especially its methodology: Define, Measure, Analyze, Improve, Control (DMAIC). When followed correctly, the rigor inherent in the DMAIC process is not optional, as illustrated in the following discussion of each phase in DMAIC. Every Green Belt or Black Belt project is a comparative experiment. Usually, the goal is to shift a mean (hit a target, minimize or maximize) and reduce variability. It follows that to validate improvements at least two comparative experiments must be completed, one to test the shift in central tendency and one to test the reduction in variation. In addition, balanced metrics should be checked to make sure, for example, that cycle time is not reduced at the cost of increased rework. Working backwards from this requirement it is easy to see that it all starts with valid data.

    Define Phase - The following questions are critical to the definition of the project and set the tone for data-based decision making: "Do I know what my "main pain" is?" " Have I identified the process that creates this pain?" " Have I identified balanced metrics to make sure that when I alleviate my pain I don't shift it elsewhere?" During the Define phase, it is vital that teams identify the main pain and potential balancing metrics. The data-based decision making flow chart assures that this happens.

    Measure Phase - The Measure phase is all about data-based decision making. The key output is a valid baseline of the main pain. To establish this requires several detailed steps. First, the main pain and balanced metrics identified in the Define phase are fully described on a data management plan. At the very least, the plan should include operational definitions, data collection and reporting information, measurement systems analysis methods, graphical displays, and stratification factors. Tables 1, 2 and 3 show a data management plan.

     Table 1: Data Description


    Metric

    Operational Definition (Verbal)
    or Formula (Symbols

    Family
    of Measure


    Data Type

    Setup Time (Min.)

    Time elapsed between last good part to acceptance of new part

    T

    Continuous

    Raw Material Dimensions (Indices)

    Process capability Cp/Cpk per print

    Q

    Continuous


     Table 2: Data Collection and Validation

    Data Source or Location

    Collector

    Sampling Plan

    Stratification Plan

    MSA Plan

    Log

    Operator

    1 / Setup

    By Machine and Operator

    Paired t-Test and Time Study

    Tag

    Receiving Inspector

    1 / Lot

    By Critical Dimension

    Gage R&R

     Table 3: Graphical Display and Project Validation

    Cntral Tendency and Variation

    Over Time

    Main Desirability

    Validate Project

    Histogram

    Individual and Moving Range Chart

    Decrease Mean

    Median Test

    Histogram

    Xbar and Sigma

    More Capable

    Median Test

    Of course it is necessary that all data used for data-based decision making be valid. Repeatability, reproducibility, stability, linearity and bias should all be explored and documented. Due diligence in this step is mandatory and legally required in some situations with regulatory requirements. Another requirement of the Measure phase is to ensure that correct sample sizes are collected, economically and free of bias. Data summaries must be calculated and presented in graphical displays to better communicate present state. These displays should contain fitted distributions to establish probabilities and decision limits. All of this must be accomplished to baseline the main pain data for comparative experiments (before data) to be used later to validate improvements and, ultimately, the project itself.

    Analyze Phase - In this phase, data-based decision making is embodied in the comparison of stratification factors to detect differences and identify potential root causes. For example, are two call centers different and if so, why? The use of analysis of variance and other comparative experiments to identify differences and potential root causes is often minimized in Black Belt courses and may be left out of Green Belt training. These represent critical blows to rigorous data-based decision making. In addition, within the Analysis phase, data-based decision making is embodied in descriptive, comparative and relational statistics to identify, quantify, and model potential root causes and solutions.

    Improve Phase - Data-based decision making is used in the Improve phase to explore pilot improvements for shifts in central tendency and reductions in variability. With a little knowledge of research methods and some minor foresight (begun in the Define phase) better research can be conducted, such as the leveraging of control groups, randomization and bias reduction.

    Control Phase - Besides validating the "goodness" of the before data, the second most critical step within DMAIC to ensure data-based decision making is the collection of "after" data to validate improvements for shifts in central tendency and reductions in variability. This is the proof. This is the better way – the better decision. One very simple question is answered: "Did we make a difference or not?" This is the reason for the statistical rigor. Can the project team, with confidence, look others in the eye and make claims to real process improvements? A second component of data-based decision making within the Control phase is the requirement to validate the sustainability of improvements. Unfortunately, this is often sacrificed in the interest of meeting tollgate reviews, deadlines and financial reporting.

    Conclusion: What Needs to Be Done

    Six Sigma has made significant contributions to how organizational members make decisions. It has allowed decision makers to move away from a reliance on decisions based on tradition, authority and intuition, and given them the tools and methodology to make better data-based decisions. However, rigorous data-based decision making in Six Sigma projects appears to be at a critical juncture. There has been a continual erosion of the teaching and use of valid data, rigorous and appropriate research methods, and statistical validation of improvements, savings and sustainability. It must be noted with concern that measurement system analysis (MSA) is increasingly left off or labeled as optional on some DMAIC roadmaps.

    To reverse this trend, it is vital that adequate training time be devoted to the topics of MSA techniques and comparative experiments. All four MSA techniques should be taught and explored in a lab setting using experiential learning strategies. Technical training is usually long on lecture and software demonstrations, and often contains no lab component at all. Rarely do participants plan, conduct and interpret their own comparative experiments within a lab setting, making transfer to real projects difficult. Four MSA labs and at least a dozen comparative experiments should be conducted by Black Belt candidates to ensure even minimal proficiency. Every branch of the following comparative experiment of Figure 2 should be understood.

     Figure 2: Comparative Experiment Decision Tree

    Because every Six Sigma project is a comparative experiment, every Green Belt should know how to conduct a before-and-after comparative experiment to detect a statistical shift in central tendency and reduction in variation. Even with Green Belts, there must be an emphasis on MSA, comparative experiments, research methods and sustainability skills, and less focus on one-shot case studies and simulations. Otherwise, a legitimate fear is that organizations and practitioners are allowing Six Sigma the pretense of data-based decision making, when in fact decisions are being made the pre-Six Sigma way – based on intuition, tradition or authority.

    About the Authors: David Wetzel is a Master Black Belt with more than 20 years of experience and is currently the director of Lean Six Sigma at VRDS, Inc., a training and consulting firm that specializes in all aspects of process and quality improvement methodologies. He has held leadership positions in technical services, operations and program management. He has been a trainer in statistics and organizational change since 1985, consulting and facilitating teams with more than a dozen businesses in the United States, Mexico, Ireland, England and Asia. Mr. Wetzel has led the full deployment of Six Sigma in several large corporations. He can be reached at dave@vrds.com. Kim Buch is associate professor of industrial/organizational psychology at the University of North Carolina at Charlotte. Her research interests include organizational change, employee involvement and quality improvement. Her work has been published in several quality improvement publications. She can be reached at kkbuch@email.uncc.edu.

     
    Rate This Article:  Current Rating: 4.39
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2009 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    BMG
    UNIVERSITY
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    >> Get Certified Now

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    JURAN

    Budget constraints halting your improvement efforts?
    They don't have to! Learn about our accelerated cost reduction methods.

    LodeStar Institute

    |

    Public & Onsite Lean Six Sigma

    Also New Live WEB Training

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $500 • Click Here!
    Register by October 14
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. Six Sigma Black Belt (DMAIC) Training Slides - 2009 Version!
      The 2009 Six Sigma Black Belt course includes over 40 more slides than the 2008 version. Contents include: 1,220 PowerPo...
    4. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    5. Process Management Training Slides
      The 2008 Process Management course is designed in two phases comprised of:352 Powerpoint slidesInstructor notesSlide exp...
    6. Certified Lean Six Sigma Black Belt E-book
      In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
    7. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
     
    Six Sigma AdLinks
    Learn statistics online with Quality Trainer by Minitab
    Rath & Strong
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2009 iSixSigma. All rights reserved. v3.0lb, 2.1-C-246
    About iSixSigma · Contact Us · Privacy Policy · Site Map