Six Sigma Quality Resources for Achieving Six Sigma Results
Click To Learn More About PremiumLinks
 Home > Tools & Templates  > Failure Modes & Effects Analysis (FMEA) Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
Nominations for iSixSigma Awards! close November 30 – nominate your project/program today!
iSixSigma Magazine Signup
 iSixSigma Live!  
  Live! Home
  2010 Summit & Awards
  2010 Energy Forum
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
  Tools & Templates
   DOE
   FMEA
   Glossary
   Histogram
   Pareto
   Poka Yoke
   SIPOC
   Software
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Email This Page

Return To Previous Page
From: 
Please enter your email address above.
To: 
Please enter recipient's email address above.
Subject Line: 
Please enter a subject line for your email above.
Additional Notes or Comments: 

Page:  Objective Defect Evaluation Leads Improvement Efforts

By Gorur N. Sridhar

Many times it is imperative for a firm to improve the quality of its deliverables even though it is operating consistently at a high sigma level. Such continuous improvement is also necessary when addressing various levels of the capability maturity model integration (CMMI), a software process guide. CMMI Level 5 calls for a proactive reduction in variation and a shift in the mean, while Level 3 involves addressing continuous improvement from a reactive position. The difficulty in completing these tasks, however, is knowing where to start. When no process area is clearly failing, but the drive for continuous improvement remains, such as in the completion of CMMI Level 5, practitioners should use an end-effect rating system to determine where to focus efforts.

Considering Errors

Selecting a direction for improvement can be hard if no one step in a software process is producing significant errors. Consider this example from a service firm that delivers computer aided drafting (CAD) models and drawings, and needs to reduce defects in drawings. Figure 1 shows the generic flow of the activities.

Figure 1: Flow Chart of CAD Models and Drawings Delivery Process

In order to improve the process, the data has to be logged and analyzed. Once the data is captured (Table 1), it can be organized in a Pareto chart for analysis (Figure 2).

Table 1: Errors in CAD Drawings
Category of ErrorsNumber of Errors
Dimensions1
Typographical error in notes1
Part number1
Base object model (BOM)1
Views not matching1
Digital raster graphic (DRG) format1
Part naming1
Angle of projection1
Datum reference1
Missed out feature1
Sketch constraints1
Geometric dimensioning and tolerances (GD&T)1
Assembly mismatch1

Figure 2: Error Categories in Pareto Analysis

But it would be inappropriate to use the data in this Pareto to take corrective action; it is a random plot of the data because each category had the same number of errors: one. Other methods must be used to determine the best course of action.

Finding Direction

In order to objectively analyze and take corrective action in instances where a solution is not readily available, a simplified version of the FMEA (failure mode and effects analysis) can be used. The FMEA caters to the Design phase of the product life cycle management. CMMI and Six Sigma practitioners use a similar approach to imagine failure during the Design phase and address it by way of either incorporating redundancy or redesign. The following is a simplified version of the FMEA concept. It incorporates a severity number, failure effect number and end effect number, which are assigned to each error category.

Arriving at the End Effect Number

Severity is rated on a scale of 1 to 4, with 4 being the most severe potential consequences of failure. The classifications for each rating are listed in Table 2.

Table 2: Severity Number Classifications
Severity CategoryFailure EffectSeverity Number
Catastrophic-Loss of life, life threatening or resulting in permanent injury or occupational illness
-Loss of launch site facilities
-Loss of system
-Long-term detrimental environmental effects
4
Critical-Temporarily disabling or occupational illness, but not life threatening
-Loss or major damage to systems or facilities
-Loss or major damage to public or private property
-Short-term detrimental effects
3
Major-Mission or system degradation2
Negligible-Any other effect1

The failure effect number is determined using the same four-option scale as the severity number, but is based on the immediate consequences of the failure. The end effect number is the product of the severity number and the failure effect number.

The severity, failure effect and end effect numbers for the CAD example are shown in Table 3.

Table 3: End Effect Number Calculation
Category of ErrorsSeverity NumberFailure Effect NumberEnd Effect Number
Dimensions4416
Typographical error in notes111
Part number111
BOM224
Views not matching111
DRG format111
Part naming 111
Angle of projection122
Datum reference3412
Missed out feature4416
Sketch constraints111
GD&T3412
Assembly mismatch224

Data may also be sorted and displayed (Figure 3) with regard to the end effect number.

Figure 3: End Effect Numbers for Error Categories

This rating system gives practitioners a more objective understanding and direction as to how to go about further analyzing the data and taking corrective action. This can give rise to a Six Sigma DMAIC project, and also justifies continuous improvement toward achieving CMMI Level 5.

About the Author: Gorur N. Sridhar is a mechanical engineer and Black Belt with more than 20 years of experience in manufacturing, quality and design fields. He also is associated with implementing and sustaining CMMI L5 activities. He is based in Bangalore and can be reached at gnsridhar@vsnl.net.

Return To Previous Page



"The Bottom Line" Links

BEST SELLING PRODUCTS (iSixSigma Publications)
  1. Six Sigma Black Belt (DMAIC) Training Slides - 2009 Version!
    The 2009 Six Sigma Black Belt course includes over 40 more slides than the 2008 version. Contents include: 1,220 PowerPo...
  2. Certified Lean Six Sigma Black Belt Assessment Exam
    Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
  3. Certified Lean Six Sigma Green Belt Assessment Exam
    This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
  4. Kaizen Workshop E-book
    This 150+ page ebook teaches key tools and techniques of Kaizen, as well as real application to enhance learning. Kaizen...
  5. Design For Six Sigma (DFSS) E-Book or Print
    Need an "encyclopedia" consisting of many of the tools you’ll study? Need a helpful refresher to apply the DFSS process?...
  6. Certified Lean Six Sigma Black Belt E-book
    In 670 pages learn everything within the Lean Six Sigma DMAIC body of knowledge to successfully achieve Black Belt certi...
  7. Six Sigma Yellow Belt Training Slides - 2009 Version
    The 2009 Six Sigma Yellow Belt course is comprised of: 503 slidesInstructor notesSlide explanations15 data sets19 suppo...
 
Six Sigma AdLinks
AdLinks Information


Google AdWords
 
Home | Discussion Forum | Event Calendar | Job Shop
Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
 Terms of Service. �2000-2009 iSixSigma. All rights reserved. v3.0lb, 0.0
About iSixSigmaContact UsPrivacy PolicySite Map