Six Sigma Quality Resources for Achieving Six Sigma Results
Online Training from BMG University Air Academy Six Sigma Certifications from Villanova University Click To Learn More About PremiumLinks
 Home > Statistics  > Control Charts Search:
 
 for    
Publications
Marketplace
| iSixSigma
Stuff
| iSixSigma
Blogosphere
| Events
Calendar
| The
Dictionary
| Discussion
Forum
| Find
a Job
| Post
a Job
| Industry
News
| Newsletter
Signup
| Sigma
Calculator
| Online
Surveys
2008 Version! DMAIC Training Slides: 1,176 Slides + Instructor Notes and More for $99.95
iSixSigma Magazine Signup
 iSixSigma Live!  
  iSixSigma Live! Summit
  Agenda
  Registration Info
  Breakthrough Awards
 Free Newsletters!  
  Sign Up Now!
  Manage Subscriptions
  New To Six Sigma?
  Six Sigma Q&A
  Cert. Practice Test
  Problem Solving Wizard
  ISSSP Info
ISSSP Is The Official Six Sigma Society of iSixSigma
 Channels 
  Europe
  Financial Services
  Healthcare
  Military
  Software / IT
 Quality Directory 
  Best Practices
  Certifications/Awards
  Consultants
  Culture Evolution
  Methodologies
  News & Events
  Organizations
  Product/Service Guides
  Statistics & Analysis
   Normality
   Variation
  Tools & Templates
  Voice of the Customer
  Free Whitepapers
 Related Topics 
  Innovation
  Outsourcing/Offshoring
  Business Process Mgt
 Quick Access 
  Help
  Search
  Advertise Here
  Article Archives
  Newsletter Archives
 User Feedback 
  Please suggest site
  improvements.
 
  [ larger form ]

Non-normal Data Needs Alternate Control Chart Approach

Bookmark This Page Bookmark This Page
Email This Page Email This Page
Format for Printing Format for Printing
Cite This Article Cite This Article
Submit an Article Submit an Article
Six Sigma Article Archive Read More Articles
Related Tools & Articles
  • Discussion Forum
    "Which type of control chart to be used in 'control' phase to sustain?"

    Contribute to this Discussion

    B
    Download Products
    y Forrest W. Breyfogle III

    Some practitioners mistakenly believe that it is not necessary to transform data before creating an individuals control chart when the underlying process distribution response is not normal. An individuals control chart, however, is not robust to non-normally distributed data. Therefore, it is important to use an alternate control charting approach.

    Necessary Transformation

    Consider a hypothetical application of the individuals control chart involving an accounts receivable department sending invoices to customers for payment. The difference between payment date and due date often follows a lognormal distribution.

    The following data can be considered a random selection of one invoice daily for 1,000 days, where the payment date for the invoice was subtracted from its due date. Therefore, for instance, a positive value of 10 indicates that an invoice payment was 10 days late.

    In this example, 1,000 points were randomly generated from a lognormal distribution with a location parameter of 2, a scale parameter of 1 and a threshold of 0 (i.e., lognormal 2, 1, 0). The distribution from which these samples were drawn is shown in Figure 1. In this simplified illustration, it is considered that nobody paid early, where the threshold would be equal to zero. A normal probability plot of the 1,000 sample data points is shown in Figure 2.

    Figure 1: Distribution from Which Samples Were Selected

    Figure 2: Normal Probability Plot of the Data

    From Figure 2, it is possible to reject the null hypothesis of normality technically, because of the low p-value, and physically, because the normal probability plotted data does not follow a straight line. This is also logically consistent with the problem setting, where a normal distribution for the output of such a process is not necessarily expected. A lognormal probability plot of the data is shown in Figure 3.

    Figure 3: Lognormal Probability Plot of the Data

    From Figure 3, a practitioner would not reject the null hypothesis of the data being from a lognormal distribution because the p-value is not below the criteria of 0.05 and the lognormal probability plotted data tends to follow a straight line. Hence, it is reasonable to model the distribution of this variable as lognormal.

    If the individuals control chart is robust to the non-normality of data, an individuals control chart of the randomly generated data should be in statistical control. In the most basic sense, using the simplest run rule (a point is “out of control” when it is beyond the control limits) such data would be expected to give a false alarm three or four times out of 1,000 points, on average. Further, a practitioner could expect false alarms below the lower control limit to be equally likely to occur as false alarms above the upper control limit.

    Figure 4 shows an individuals control chart of the randomly generated data.

    Figure 4: Individuals Control Chart of the Random Sample Data

    The individuals control chart shows many out-of-control points beyond the upper control limit. In addition, the individuals control chart shows a physical lower boundary of 0 for the data, which is well within the lower control limit of -22.9. If no transformation is needed when plotting non-normal data in a control chart, then a practitioner would expect to see a random scatter pattern within the control limits, which is not the case in Figure 4.

    Figure 5 shows a control chart using a Box-Cox transformation with a lambda value of 0, the appropriate transformation for lognormally distributed data.

    Figure 5: Individuals Control Chart with a Box-Cox
    Transformation, Lambda Value of 0

    This control chart is much better behaved than the control chart in Figure 4. Almost all 1,000 points are in statistical control. The number of false alarms is consistent with the design and definition of the individuals control chart control limits.

    Finding the Process Capability Metric

    By using a lognormal probability plot, it is possible to determine the best estimate process capability metric output for this fictitious process: 80 percent of all invoices are paid between 2.1 and 27.4 days beyond the due date, with a median of 7.7 days late, when no specification exists (Figure 6).

    Figure 6: Lognormal Plot of Data with 80 Percent
    Frequency of Occurence Rate

    If data is not from a normal distribution, an individuals control chart can generate many false signals, leading to unnecessary tampering with the process. When no specifications exist, a best estimate for the 80 percent frequency of occurrence rate, along with median response, is an easy-to-understand description that conveys what the process is expected to produce in terms that everyone can visualize. If a specification exists, then the percentage non-conformance can be determined from the probability plot and be presented as the process capability of the process.

    Avoiding Type 1 Errors

    The specific distribution used in the prior example, lognormal (2, 1, 0), has an average run length (ARL) of 28 points for type 1 errors (when the null hypothesis is rejected in error). The single sample used showed 33 out-of-control points, close to the estimated value of 28. Considering a less-skewed lognormal distribution, lognormal (4, 0.25, 0), the ARL for false rule one errors drops to 101. Note that a normal distribution will have a type 1 error ARL of around 250.

    The lognormal (4, 0.25, 0) distribution passes a normality test more than half the time with samples of 50 points. In one simulation, a majority (75 percent) of the type 1 errors occurred on the samples that tested as non-normal. This result reinforces the conclusion that normality or a near-normal distribution is required for a reasonable use of an individuals chart or a significantly higher type 1 error rate will occur.

    About the Author: Forrest W. Breyfogle III is chief executive officer and president of Smarter Solutions Inc. He is the creator of the Integrated Enterprise Excellence management system, which is documented in a set of four books published by Bridgeway Books in 2008. A professional engineer, he is an American Society for Quality (ASQ) Fellow who serves on the board of advisors for the University of Texas Center for Performing Excellence. He received ASQ’s 2004 Crosby Medal for his book, Implementing Six Sigma, Second Edition (John Wiley & Sons, 2003). He can be reached at forrest@smartersolutions.com.

     
    Rate This Article:  Current Rating: 4.27
      Poor    Excellent     
              1    2    3     4    5
    Copyright © 2000-2008 iSixSigma – All Rights Reserved
    Reproduction Without Permission Is Strictly Prohibited – Copyright Requests


    Publish an Article: Do you have a Six Sigma tip, learning or case study?
    Share it with the largest community of Six Sigma professionals, and be recognized by your peers.
    It's a great way to promote your expertise and/or build your resume. Read more about submitting an article.


    "The Bottom Line" Links

    1BMG
    UNIVERSITY
    .
    I
    I
    Lean Six Sigma
    Online
    I
    I
    Reduce Travel Costs
    Maximize Training Budget

    VILLANOVA
    UNIVERSITY
      Earn Your Lean, Green or Black Belt Six Sigma Master Certificate Online
    BOOST YOUR SALARY! *$38k more than uncertified counterparts. Learn From Industry Leaders!
      START NOW

    SIGMAPRO

    MBB, Lean Sigma, & DFSS

     

    when experience matters most...

    M O T O R O L A
    U N I V E R S I T Y
    Learn from the most experienced
    practitioners of Six Sigma in the world

    Public Training & Certification
    Click here to take a free Six Sigma Lesson

    JURΛN

    2009 Lean Six Sigma Public Workshops - SPECIAL OFFER!
    Register for any course before December 31st and receive 50% off any additional registrations, plus receive free consulting support! Call 800-338-7726 to register.

    LodeStar Institute

    |

    Live Lean Six Sigma Training

    Starting at $660

     WHY SETTLE FOR ONLINE? GET LIVE TRAINING AND PROJECT MENTORING FOR ONLINE PRICES.
    Finding that key person for your
    team is just a click away . . .
       
    TheJobShop

    jobs.isixsigma.com
         
    THE UNIVERSITY OF
    TEXAS
    AT AUSTIN

    2 weeks + 1 project = Black Belt Certification
    .
    Find us on LinkedIn
    Join the iSixSigma Network
    and Connect with Other Six Sigma Pros
    .
    .
    iSixSigma Live! Summit & Awards
    Jan 13-16, 2009 • Miami, FL
    Save up to $200.00 • Click Here!
    Space is Limited! Hurry!
    .

    BEST SELLING PRODUCTS (iSixSigma Publications)
    1. Certified Lean Six Sigma Green Belt Assessment Exam
      This assessment exam is useful for students interested in assessing their knowledge of Lean Six Sigma on the Green Belt ...
    2. Certified Lean Six Sigma Black Belt Assessment Exam
      Interested in assessing your knowledge of Lean Six Sigma? Preparing for certifications? Testing your students and traine...
    3. 5S Training Course
      One of the key fundamental tools of process improvement is 5S. 5S is a methodology for organizing and minimizing item...
    4. Six Sigma Black Belt (DMAIC) Training Slides
      The 2008 Six Sigma Black Belt course is comprised of: 1,176 PowerPoint slides, Instructor notes, Slide explanations, 37 ...
    5. Six Sigma DMAIC Training Slides
      The complete 2008 Lean Six Sigma DMAIC course prepares participants to perform the role of a LSS Black Belt; covering wh...
    6. Gage R&R Excel Template
      Gage Repeatability and Reproducibility (R&R) studies measure the amount of measurement variation that is attributabl...
    7. CSSBB Preparation Pack
      The CSSBB Preparation Pack includes materials for passing the Certified Six Sigma Black Belt (CSSBB) exam. This CSSBB Pr...
     
    Six Sigma AdLinks
    Rath & Strong
    Learn statistics online with Quality Trainer by Minitab
    SBTI Public Offerings, World Class MBB, Lean Enterprise
    SigmaXL: User Friendly Excel Add-ins for Statistical and Graphical Analysis
    Smarter Solutions Makes Lean Six Sigma Easier
    SigmaWorks: A complete toolbox for LSS & DFSS
    Michigan Engineering - Six Sigma Certifications
    @RISK for Six Sigma and quality analysis
    AdLinks Information


    Google AdWords
     
    Home | Discussion Forum | Event Calendar | Job Shop
    Link To iSixSigma | Rate This Page | Report A Problem | Free Content For Your Site | Submit Article For Publishing
     Terms of Service. ©2000-2008 iSixSigma. All rights reserved. v3.0lb, 2.0-A-244
    About iSixSigma · Contact Us · Privacy Policy · Site Map
    nogeo