SUNDAY, APRIL 20, 2014
Font Size
Topic Six Sigma Limits

Six Sigma Limits

Home Forums Old Forums General Six Sigma Limits

This topic contains 0 replies, has 1 voice, and was last updated by Avatar of Jose Jose 7 years, 6 months ago.

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #113331

    Hi.
    Please I just need a help in this little problem about the limits of Six Sigma.This is the point: when I use Three sigma Process with a 1.5 sigma shift in the mean ( I will use numbers :  x=7  days ;UCL= 10  LCL = 3  standard deviation = 1 ) the result is that the mean moves from 7 to 8.5 or 5.5 ( I undestand this perfectly).
     But when I use Six Sigma Process with a 1.5 sigma drift in the mean the results is from 7 days to 6.25 or 7.75 days .    The problem is in the Six Sigma for Green Belts and Champions, Howard Gitlow ( Excellent Book).  But I am a little bit confuse.
    Please an expert of Six Sigma could clear my doubt up.
    Thanks so much for your help.
    Jose

Viewing 1 post (of 1 total)

The forum ‘General’ is closed to new topics and replies.

Login Form