iSixSigma

K S Varadhan

Forum Replies Created

Forum Replies Created

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #67575

    K S Varadhan
    Participant

    FMEA is proactive to weed out likely modes of failure. Control plan is reactive in the sense that during manufacture/conversion adequete care is taken to conform. This is to ensure that what was visualized during FMEA is tranlated in to product/service preventing occrrence of failure modes. We can compare FMEA and Control Plan to Quality of Design amd Quality of Conformance in the classical Quality control concept. 

    0
Viewing 1 post (of 1 total)