    There is a lot of information in Minitab, particularly the StatGuide which is accessible in a context specific fashion in whatever module you are trying to complete. There is also the tutorial sessions which walk you through a lot of the common graph themes/issues.
    Refer to the Help menu for more information.
    If you understand what the graph is supposed to demonstrate & the correct usage then these should help you to create that in Minitab.
    Finally, Minitab offer a downloadable ‘help’ file (for Vers 14 but transferable) at http://www.minitab.com/support/docs/rel14/14helpfiles/ which should also help.
    Of course, the best solution is to attend a training session to get a comprehensive review.
    Hope this helps.

    0
    #57202

    Kenny
    Participant

    As someone who teaches ASQ material within a university/ industry partnership program I can add to Angelina’s comments by saying that the requirements of passing the ASQ certification examination far exceed anything that you would typically be asked to achieve in an industry based training scheme. There are no computers in the ASQ exam; ANOVA tables manually calculated anyone??
    Best of luck in your job search Angie! :~)

    0
    #57201

    Kenny
    Participant

    Mike,
    I guess the classic 6S response of ‘it depends’ really applies here as the individual situation will determine the duration of the project. Use of Project Management techniques (network scheduling, Gantt charts) could help but really you & your steering committee would need to evaluate each project & agree a timeline.
    As a rough & ready rule of thumb, coming from a high volume manufacturing standpoint, we generally say 3 months total duration for a GB project (GB spending at least 20% of working time on the project) & 6 months for a established BB working a project full time.
    In terms of individual gates I would feel that Define & Measure would generally be the quickest tollgates, particularly for a GB project, Analyse would take a large portion of time as this could involve MSA redesign activities, Improve would be pretty quick depending on the solutions provided & based on your structure (& senior management commitment) Control could go either way.
    There are so many factors that effect project duration & gate attainment that realistically you’ll need to evaluate each project in turn.
    Hope this helps a little! K.

    0
    #125105

    Kenny
    Participant

    Please feel free to contact me. I work for an Emerson division and we have a whole recognition program that we provide recognition for members of Continuous Improvement Teams. 1st off, we track teams via a home-built global db. If an emplyee participates on 5 teams in a fiscal year, they receive a nice framed certificate. If they serve on 10 teams, they get a nice engraved “trophy”. And for those that are on 15 teams, they receive permanent recognition on our “CIP in Action” wall.

    0
    #114845

    Kenny
    Participant

    How much understanding do you have on the theory behind control chart applications and why 3 sigma limits are used?

    0
    #110151

    Kenny
    Participant

    Hey Guys,I need a topic for my graduate project or thesis in Quality Assurance and am thinking of performing a project on something related to Lean Six Sigma. Do you guys have any suggestions for me in terms of topics? Please provide me with some project or thesis ideas.
    Thanks,
    Kenny

    0
    #102567

    Kenny
    Participant

    As a QC Manager, my direct boss is the plant GM.  I also have a Corporate QA Manager, all under Manufacturing and Fabrication. (pipe fabrication)

    0
    #91793

    Kenny
    Participant

    Hi..I am new to MSA, and am doing some own studies.
    I noticed that most tests are made on 10-3-3 version (10 parts, 3 appraisers, 3 trials). I was wondering whether there are other combinations (eg 5-2-2, 20-4-6..). Plus, can the 10-3-3 formulas/calculations applied to those other versions? How about the constant values of K1, K2 and K3 ?
    I heard that the MSA book by AIAG has the complete values of the constants, but I do not have access to purchasing the book. Is there anyway I can get the list of the constants..?
    Please help… 

    0
    #90197

    Kenny
    Participant

    Bonjour,
    I have just finished Lean Six Sigma Black Belt training and three activities (1 BB project, 1 VSM, and 1 Kaizen Event) in order to get BB certified. I am now planning on taking DFSS and looking around for best institute. I would suggest you to jump right into it since you already have Six Sigma basis. Good Luck!
    Aurevoir,
    Kenny

    0
    #75965

    Kenny
    Participant

    I also am very interested. Where are the attachments?

    0
    #71346

    Kenny
    Participant

    Thanks Erik.
    My mistake, the formula should be
      LCLp = pBar-3*(pBar(1-pBar))^0.5/n^0.5
    From the formula, LCL can be negative if pBar is small or n is small.
    Just like to know, if LCL is negative, what can i do ?
    What is requirement of binomial ?
    Kenny

    0
    #70924

    Kenny
    Participant

    Sorry if my question confuse you all.
    What i want to say is that,    1) at initial stage, without collect any data, i fix Cp and the spec torelance, i calc the Std_Dev.   2) i calc RBar from Std_Dev.  (RBar=d2*Std_Dev)   3) and i calc A2*RBar from RBar.
    So, can i use “this” A2*RBar as economic control limit at initial stage ?Or Is there any method to estimate control limit at *any* stage ?