Shan
was active Not recently activeActivity
-
Shan replied to the topic selecting pilot lean plant in the forum General 13 years, 7 months ago
Dear Scot,
Your Thoughts are right.
Apart from that, Make a matrix of your plants w.r.to Lean Metrics (S,Q,C,D,M) and Degree of complexity in Lean transformation.
Rate in scale of (1 – 10). Discuss with your Top Management with this grid and select the ‘Pilot’
Above will help you to bridge the gap between your and Management Thoughts on the…[Read more] -
Shan replied to the topic six sigma in the forum General 14 years ago
Hi,You can contact Indian Statistical Institute in Chennai or Bangalore.But I don’t think there is a distance education available.Shan
-
Shan replied to the topic Green belt project examples? in the forum Finance 14 years ago
Hi,
Can you be more specific… & nature of problem you are trying to address.
-
Shan replied to the topic Process capability study in the forum General 14 years, 8 months ago
-
Shan replied to the topic Varying levels of lean? in the forum General 14 years, 8 months ago
Lean is purely common sense approach… Based on your industry just start with one product family like prototype..show cast the result
buy in the management concurrence to go ahead in a big scale across factory
shan -
Shan replied to the topic key process in the forum General 14 years, 8 months ago
to your query.. It’s A
always remember…
VSM is for selected process, where maximum products flows
shan
-
Shan replied to the topic Parallel boxes in VSM in the forum General 14 years, 8 months ago
-
Shan replied to the topic Process capability study in the forum General 14 years, 8 months ago
For a process like painting, plating, case hardness process capability is not a apt method to qualify the process..
DOE is the right method of qualifying the process.
1. Define the functional parameters affecting the process. Run the process based on DOE method and record your optimum setting.
2. Fix the frequecy for performing the trial (…[Read more] -
Shan replied to the topic White Belt in the forum General 15 years, 4 months ago
Ajit,
But for each belt / level there should be some meaning associated with. -
Shan replied to the topic Dimensions Project in the forum Europe 16 years, 6 months ago
Hi,
As ur Process output is of dimensional chracteristics.
First step is
1. Conduct Repeatablity and Reproduciblity
2. Based on the study. confirm ur measurment process. do 4M analysis – Men , M/C ,Method, Material. or Multi vari approach to find the root cause.
shan