iSixSigma

Design of Experiment

Six Sigma – iSixSigma Forums Old Forums General Design of Experiment

Viewing 5 posts - 1 through 5 (of 5 total)
  • Author
    Posts
  • #49201

    Shiraz Bajwa
    Member

    How has the success rate been in getting Greenbelts to identify and execute a transactional DOE…comments?

    0
    #167791

    New MB
    Participant

    DOE is  not meant  for GBs,it is  mainly for BBs

    0
    #167817

    Shiraz Bajwa
    Member

    True. But then so are a lot of other things. Our GB training is pretty involved- but lately i’ve had the DOE component cut out of the training. Rather, 1-day voluntary workshops are done for GB’s who have that aptitude or inclination. However, I do have some reservations on this strategy so want to see if anyone else has tried it.

    0
    #167826

    Mikel
    Member

    You  are wrong

    0
    #167859

    e
    Participant

    Please share a specific case of a great transactional DOE.  I’m just asking for what output was measured and what specific inputs were tested.
    Thanks.

    0
Viewing 5 posts - 1 through 5 (of 5 total)

The forum ‘General’ is closed to new topics and replies.