Different Uptimes
Six Sigma – iSixSigma › Forums › Operations › Manufacturing › Different Uptimes
- This topic has 1 reply, 1 voice, and was last updated 7 years ago by
Amit Kumar Ojha.
-
AuthorPosts
-
May 5, 2015 at 6:01 pm #55021
DanielGuest@DasdInclude @Dasd in your post and this person will
be notified via email.Sorry my English is not very Good.
When i calculate Take time, i require available time. But what happens If the production line has operations With different uptimes. Should my available time be the bottleneck operation available time?
Example:
Op. 1, available time 3000 seg. Uptime 100%
Op. 2, available time 2400 seg. Uptime 80% (downtime due to cleaning and change oil)
Op. 3, available time 3000 seg. Uptime 100Demand 100 pcs daily
What is my takt time
0May 6, 2015 at 1:03 am #198238
Amit Kumar OjhaParticipant@AmitOjhaInclude @AmitOjha in your post and this person will
be notified via email.In order to determine the takt time you need to consider the available time which in this case is limited by op2. Hence you may consider 2400 sec as available time to determine takt time.
0 -