iSixSigma

DMAIC phase wise Black belt utilisation

Six Sigma – iSixSigma Forums Old Forums General DMAIC phase wise Black belt utilisation

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #44563

    dangwal
    Participant

    Just wandering what is the percentage effort & time spent by the black belt in each of the DMAIC phase during his projects??
    Can we derive the utilisation chart for the black belts ….
     

    0
Viewing 1 post (of 1 total)

The forum ‘General’ is closed to new topics and replies.