    At what stages in a design project would you do an FMEA?
     

    0
    #158453

    Dixit
    Member

    A procedure and tools that help to identify every possible failure mode of a process or product, to determine its effect on other sub-items and on the required function of the product or process. The FMEA is also used to rank & prioritize the possible causes of failures as well as develop and implement preventative actions, with responsible persons assigned to carry out these actions.Failure modes and effects analysis (FMEA) is a disciplined approach used to identify possible failures of a product or service and then determine the frequency and impact of the failure.Hence it is essential to conduct FMEA before finalizing the Design.

    0
    #158456

    GomezAdams
    Participant

    1. Concept definition : System FMEA
    2. Detailed component definition : Component Design FMEA’s.
    3. Process definition : Process FMEA

    0
    #158470

    Chad Taylor
    Participant

    Mr T
    Typically an FMEA is performed during the design development process. Final FMEA at design completion should also be conducted.
    Chad Taylor

    0
    #158486

    Silviu
    Member

    Mr T,
    I think FMEA can be used in DMAIC in:

    ANALYZE phase: after you have done Ishikawa diagram and you have some X variables influencing your Y. It will help you get deeper into cause analyses.
    IMPROVE phase: to verify you solution
    silviu