Looking for Ideas for How to Improve Turnaround Time in the Electrophysiology Lab

Six Sigma – iSixSigma Forums Industries Healthcare Looking for Ideas for How to Improve Turnaround Time in the Electrophysiology Lab

This topic contains 3 replies, has 4 voices, and was last updated by  Chris Seider 2 weeks ago.

Viewing 4 posts - 1 through 4 (of 4 total)
  • Author
    Posts
  • #243188

    kam221
    Participant

    I’m in the beginning stages of doing a project on turnaround time. What kind of business model should I use? Has anyone done a similar project?

    0
    #243193

    Katie Barry
    Keymaster

    @kam221 Did you try searching our site for ideas? A quick search reveals a lot of results for “turnaround time” and “TAT”.

    0
    #243199

    Strayer
    Participant

    My “go-to” tool when time is the concern is a Time Value Map.  It shows how much time is spent on each step, which are value-added and non-value-added, and wait time between steps.  You want to minimize the non-value-added and wait before trying to speed up the value-added.  There are three caveats about using a TVM.  It assumes a stable  process.  It assumes a linear process.  You have to measure time for each step often enough to be confident about the average (see sample size), and if there’s wide variance in any step that’s another problem.

    0
    #243212

    Chris Seider
    Participant

    do you have a problem statement and a metric chart(s) that the project champion agrees are measures of success?