iSixSigma

length of a 6 sigma project

Six Sigma – iSixSigma Forums Old Forums General length of a 6 sigma project

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #42870

    New BB
    Participant

    Just curious, how long is a usual six sigma project?  I recently concluded my first successful project, it just took me 2.5 months. 

    0
    #135501

    Furneaux
    Member

    Most projects take between 3-6 months, but 2.5 months is good for a first project, it means it was well-scoped.

    0
Viewing 2 posts - 1 through 2 (of 2 total)

The forum ‘General’ is closed to new topics and replies.