iSixSigma

Process Stability

Six Sigma – iSixSigma Forums Old Forums General Process Stability

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #36828

    A.S.
    Participant

    While reviewing the control charts when we can say process is stable?
    Whether Just all points are within the control limits is adequate ?

    0
    #107204

    Darth
    Participant

    Points are within the control limits and the pattern is random, usually determined by applying the Western Electric rules.

    0
Viewing 2 posts - 1 through 2 (of 2 total)

The forum ‘General’ is closed to new topics and replies.