iSixSigma

Process Tolerance’s importance in RR studies

Six Sigma – iSixSigma Forums Old Forums General Process Tolerance’s importance in RR studies

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #32027

    Ranjan
    Participant

    I have a machine that records the lengths of bolts. When I do a 2 operator R&R study, do I need to have a process tolerance to calculate the R&R errors ? I have no idea what tolerance I have to use.

    0
Viewing 1 post (of 1 total)

The forum ‘General’ is closed to new topics and replies.