    When you are in the measure phase what are the questions for the tollgate?

    0
    #160216

    Anand
    Participant

    What was the objective of measure phase?
    What was the type of data you were supposed to measure?
    What is the tool used for measurement?
    Was the measurement system Analyzed and if yes which statistical tool was used?
    How was MSA performed?
    What is Operational Definition?
    What factors were considered before preparing data collection plan?
    How many samples were collected and how the number of samples to be gathered was reached?
    What is the Sigma level of your process?
    How was sigma value considered?
    Did team check for stability of data before calculating sigma value and if Yes – How?
    What does this Sigma value mean to you?

    0
    #160217

    Vaculin
    Member

    Thank you so much!

    0
    #160219

    qualitycolorado
    Participant

    Roz, Good morning!
     
    I’m pretty sure there are “boilerpltte” tollgate agendas elsewhere on the iSixSigma site — have you tried the search engine (upper right corner, just below the banner ads)?
     
    Best regards,
    QualityColorado