Re-looping in a VSM

Viewing 1 post (of 1 total)
  • Author
    Posts
  • #257087

    industrialenggirl
    Participant

    Hi there,

    Was wondering if anyone had best practices for representing a part going through a process more than once in a Value Stream Map?
    For example: Let’s say you have an initial inspection of a part. The part then goes through a couple more processes and then requires another, more “final inspection.” However, the method of that final inspection is similar to the first one. And the final inspection is done at the same station, and shares the same resources as the first.
    Do you suggest just using a second process box for this?