Reduce Reliability Test Time

Six Sigma – iSixSigma Forums Operations Manufacturing Reduce Reliability Test Time

This topic contains 1 reply, has 1 voice, and was last updated by  Strayer 1 year ago.

Viewing 2 posts - 1 through 2 (of 2 total)
  • Author
    Posts
  • #55908

    Jack

    I have a problem in testing the punch and stapler reliability. It’s usually take 5-6 weeks to complete the test. Moreover, need few staff in my factory keep punching the paper or stapling the paper which is a waste of resource but this is the only way to test the new punch or stapler reliability. May I know is there a better way or method to reduce the liability test and resources?

    0
    #202111

    Strayer
    Participant

    The short answer is to time-value map or value stream map your testing process to identify where wasted time occurs. Another idea is that you may be using a larger sample size than you really need for reasonable confidence in your test results.

    0
Viewing 2 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic.