    We have conducted a repeatability study, and have a % study greater than the 30% cutoff. Yet taking the tolerance into account, the % tolerance is 2.4%. The number of distinct categories is stated as 2.
    My questions:
    Is this measurement system capable?
    Am I correct in saying the % tolerance is OK?
    I believe the distinct categories are cause for concern. Am I correct?
    Minitab output enclosed:
    Gage R&R
    %Contribution
    Source VarComp (of VarComp)
    Total Gage R&R 0.0000040 22.85
    Repeatability 0.0000040 22.85
    Part-To-Part 0.0000135 77.15
    Total Variation 0.0000175 100.00
     
    Study Var %Study Var %Tolerance
    Source StdDev (SD) (6 * SD) (%SV) (SV/Toler)
    Total Gage R&R 0.0020000 0.0120000 47.80 2.40
    Repeatability 0.0020000 0.0120000 47.80 2.40
    Part-To-Part 0.0036752 0.0220515 87.84 4.41
    Total Variation 0.0041842 0.0251051 100.00 5.02
     
    Number of Distinct Categories = 2

    0
    #113313

    Oman
    Participant

    I couldn’t read the Mintab output that well, but if your % study variation is greater than 30% and your distinct number of categories is 2, then the system is not capable.  You would want to review the raw data to try and determine if everything went as planned and if you need to perform the test again.
    2 distinct categories means that your sysstem is essentially attribute capable above or below a certain value.