Does anyone have a list of the various metrics displayed in Value Stream Maps, what they mean and how they are calculated? eg cycle time, processing time, uptime, takt time etc.
Many thanks.0August 23, 2007 at 2:50 pm #160339Hi Mr ‘T’
Based on the purpose for which you are drawing your Value Stream Maps, you need to identify which metrics you want to capture data for and then you can go ahead with it.
There is no point wasting time in collecting something which you would never use.