be notified via email.From a perspective of Statistical Process Control (SPC), a six-sigma process will have which of the following attributes?
a) The USL and LSL will be separated by a distance of six sigma
b) The process center will be aligned with the LSL
c) The number of defects produced by the process will be 0.0018 parts per million
d) All of the abovenote
we are tried asper log ( a) but unfortunately wrong
0October 24, 2020 at 11:17 am #250582
Chris SeiderParticipant@cseiderInclude @cseider in your post and this person will
be notified via email.Consider looking up Z normal tables versus sigma and check out tables that don’t “shift” and then consider you will have SOME defect rate at both ends of the curve and add.